Williamsbridge Flood Exposure  ·  NYC DEP Combined Sewer Area HP-014

Williamsbridge, Bronx - HP-014

Properties in this area share the HP-014 combined sewer — during moderate-to-heavy rain, runoff can exceed pipe capacity faster than it drains, which is what drives sewer backup exposure block by block. Here’s what that looks like for Williamsbridge, Bronx specifically.

HP-014 is a combined sewer area covering 14,618 properties in Williamsbridge, Bronx. Flood Form rates 33% of them Moderate or High for stormwater, 14% for sewer backup, and 1% for groundwater. None rate that high for coastal flooding. 91% of lots have yard area that legally qualifies for on-site infiltration. Ground elevation varies widely here: the land drops from about 161 ft to 51 ft, sloping down toward the southeast. Rain that falls uphill runs down the streets toward the low end, so properties there take on water from the blocks above as well as their own, and are the first to see ponding and sewer backups when the pipes fill. Properties higher up shed water downhill and pond less, so where a lot sits on the slope matters more here than any average for the area. The median building dates to 1950. 9% of parcels sit over a historic stream or pond. According to NYC DEP green infrastructure records, this sewershed drains to Westchester Creek. NYC DEP has built 66 green infrastructure assets here. NYC DEP models about 42 combined sewer overflows a year at its outfall.

See where your property stands

Sewershed HP-014
CSO Outfall
Stormwater Flooding
Historic Waterbody

Flood exposure in Williamsbridge (HP-014)

The share of properties Flood Form rates Moderate or High for each type of flooding, on the same Minimal to High scale as an individual report.

33%

Stormwater exposure: Moderate or High

14%

Sewer Backup exposure: Moderate or High

1%

Groundwater exposure: Moderate or High

0%

Coastal exposure: Moderate or High

What sets Williamsbridge (HP-014) apart

The three figures on which HP-014 differs most from the rest of NYC’s combined sewer areas.

14,618

Properties in sewershed

Larger than 95% of NYC's combined sewer areas. Many lots share this one outfall.

110 ft

Elevation change from low to high ground

Steeper than 93% of NYC's combined sewer areas. Runoff from the higher blocks flows downhill onto the lower ones.

91.2%

Legally eligible for on-site infiltration

Higher than 92% of NYC's combined sewer areas. More yards here have room to soak stormwater in.

Stats computed from Flood Form’s NYC parcel data as of October 14, 2026

The worst corner in Williamsbridge

Barnes Avenue & East 217th Street

Of the 226 four-way intersections Flood Form compared in HP-014, the 20 lots within 50 meters of this one carry the highest average compound flood exposure: a score of 18.8, against 4.5 across the sewershed.

High

Compound exposure

High

Stormwater exposure

Moderate

Sewer Backup exposure

Minimal

Groundwater exposure

Minimal

Coastal exposure

Ratings are for the average lot near the corner, on the same Minimal to High scale as a report

Common solutions for Williamsbridge properties

The measures that most often suit conditions in HP-014. An individual Flood Form picks the exact set for one lot. See all flood prevention solutions.

  • Downspout Diversion illustration

    Downspout Diversion

    Redirect roof downspouts away from the sewer system toward permeable yard areas, planters, or a rain barrel.

    Complexity: Low  ·  1–4 weeks

  • Modular Drywell System illustration

    Modular Drywell System

    An NDS Flo-Well modular drywell system lets water soak into the ground on-site.

    Complexity: Moderate  ·  1–3 weeks

  • Rain Garden illustration

    Rain Garden

    A shallow planted depression that collects runoff from roofs and paved areas and lets it soak into the ground over a day or two.

    Complexity: Low  ·  1–3 weeks

  • Area Drain illustration

    Area Drain

    A yard area drain — a surface inlet at the lowest point in the yard — provides a direct outlet for stormwater that pools on the site.

    Complexity: Low  ·  1–4 weeks

  • Increase Permeable Area illustration

    Increase Permeable Area

    On-site interventions include permeable paving for driveways and walkways, removing concrete from yard areas, and adding planted beds — reducing impervious coverage that limits the neighborhood's collective capacity to absorb rain.

    Complexity: Low  ·  Ongoing

  • Detention System illustration

    Detention System

    A detention cistern or underground storage tank temporarily holds stormwater runoff and releases it slowly after storm peaks subside.

    Complexity: High  ·  3–6 months

Which of these fit your lot?

Your Flood Form rates your property’s exposure and recommends the measures suited to it.

City sewer and stormwater work in Williamsbridge (HP-014)

The city has 3 sewer, stormwater and coastal projects planned, in design or under construction in this area. Another 7 projects are upgrading the treatment plant this area drains to.

3

City projects planned or underway

$61.7M

City budget for these projects

  • Coastal protection · In design

    Pelham Bay Park Seawall Reconstruction

    ScheduleJan 2020 → Jan 2029
    Spending$13K budget

    NYC Parks

  • New and upgraded sewers · In design

    Bronx and Manhattan, Combined Sewers

    ScheduleApr 2026 → Apr 2030
    Spending$4.6M budget

    NYC Design and Construction

  • Green infrastructure · In design

    Porous Concrete Sidewalk Panels, Bronx River and Westchester Creek Watersheds

    ScheduleMay 2023 → Aug 2030
    Spending$5.3M of $57.2M

    NYC Design and Construction

Dates and dollars from the NYC Capital Projects Dashboard (May 2026 update) and the city's Capital Planning Database; street permits from NYC DOT, checked daily.

What does this mean for your property?

Projects like these work across a whole drainage area and take years to finish. They don't change how water reaches a building through its own sewer connection, doors or foundation, which is what a property-level plan addresses.

Questions about flooding in Williamsbridge (HP-014)

What is the HP-014 sewershed in Williamsbridge?

HP-014 is the part of Williamsbridge, Bronx whose combined sewer leads to NYC DEP outfall HP-014. Its 14,618 properties share that pipe for both rain and wastewater, so a heavy storm anywhere in the area uses up capacity for every block in it. When the pipe is over capacity, the overflow discharges to Westchester Creek.

Has street flooding been measured in Williamsbridge (HP-014)?

Yes. Two FloodNet street-flood sensors in HP-014 have recorded 1 flood since they were installed, the deepest 4.5 inches. It came on October 30, 2025. FloodNet is a citywide network of sensors that measure water on the street.

How exposed to flooding is Williamsbridge (HP-014)?

The most widespread exposure in HP-014 is stormwater: Flood Form rates 33% of properties Moderate or High for it. The share is 14% for sewer backup and 1% for groundwater. These figures describe the whole area, and exposure varies lot by lot within it.

Can properties in Williamsbridge (HP-014) manage stormwater on site?

91% of lots in HP-014 have yard area that legally qualifies for on-site infiltration, such as a drywell or rain garden. A lot without that room can still hold runoff with a detention tank or a blue roof.

Is Williamsbridge flooding right now?

The live check at the top of this page shows whether flooding is likely in Williamsbridge now. It combines National Weather Service flood alerts for the Bronx, NYC DEP's modeled combined sewer overflow advisories, and the past three hours of rain. Most NYC sewers are designed for about 1.75 inches of rain an hour, so a heavy downpour can flood streets and basements on low blocks before any alert goes out. Report street flooding or a sewer backup to 311, and call 911 if anyone is in danger.

Nearby neighborhoods and sewersheds

Bronx Flood Map →All NYC sewersheds →