Is East Williamsburg flooding right now?
Checking live flood alerts and sewer overflow conditions…
East Williamsburg Flood Exposure · NYC DEP Combined Sewer Area NCB-012
East Williamsburg, Brooklyn - NCB-012
Properties in this area share the NCB-012 combined sewer — during moderate-to-heavy rain, runoff can exceed pipe capacity faster than it drains, which is what drives sewer backup exposure block by block. Here’s what that looks like for East Williamsburg, Brooklyn specifically.
NCB-012 is a combined sewer area covering 1,861 properties in East Williamsburg, Brooklyn. Flood Form rates 49% of them Moderate or High for stormwater, 26% for sewer backup, 8% for groundwater, and 1% for coastal flooding. 56% of lots have yard area that legally qualifies for on-site infiltration. The ground slopes gently down toward the east, from about 52 ft to 19 ft, so runoff from higher blocks drains toward lower ones. The median building dates to 1930. 19% of parcels sit over a historic stream or pond. According to NYC DEP green infrastructure records, this sewershed drains to East River / Open Waters. NYC DEP has built 6 green infrastructure assets here. NYC DEP models about 19 combined sewer overflows a year at its outfall.
See where your property stands
Flood exposure in East Williamsburg (NCB-012)
The share of properties Flood Form rates Moderate or High for each type of flooding, on the same Minimal to High scale as an individual report.
49%
Stormwater exposure: Moderate or High
26%
Sewer Backup exposure: Moderate or High
8%
Groundwater exposure: Moderate or High
1%
Coastal exposure: Moderate or High
What sets East Williamsburg (NCB-012) apart
The three figures on which NCB-012 differs most from the rest of NYC’s combined sewer areas.
26%
Properties with Moderate or High sewer backup exposure
Higher than 84% of NYC's combined sewer areas. Backups from the shared pipe are a concern on more lots here.
6
NYC DEP green infrastructure assets built
Higher than 76% of NYC's combined sewer areas. City-built rain gardens and similar assets already take some runoff here.
56.2%
Legally eligible for on-site infiltration
Lower than 75% of NYC's combined sewer areas. Few yards can legally infiltrate, so holding runoff matters more.
Stats computed from Flood Form’s NYC parcel data as of October 14, 2026
The worst corner in East Williamsburg
White Street & Seigel Street
Of the 45 four-way intersections Flood Form compared in NCB-012, the 12 lots within 50 meters of this one carry the highest average compound flood exposure: a score of 17.8, against 5.7 across the sewershed.
High
Compound exposure
High
Stormwater exposure
Moderate
Sewer Backup exposure
Moderate
Groundwater exposure
Minimal
Coastal exposure
Ratings are for the average lot near the corner, on the same Minimal to High scale as a report
Common solutions for East Williamsburg properties
The measures that most often suit conditions in NCB-012. An individual Flood Form picks the exact set for one lot. See all flood prevention solutions.

Downspout Diversion
Redirect roof downspouts away from the sewer system toward permeable yard areas, planters, or a rain barrel.
Complexity: Low · 1–4 weeks

Modular Drywell System
An NDS Flo-Well modular drywell system lets water soak into the ground on-site.
Complexity: Moderate · 1–3 weeks

Rain Garden
A shallow planted depression that collects runoff from roofs and paved areas and lets it soak into the ground over a day or two.
Complexity: Low · 1–3 weeks

Area Drain
A yard area drain — a surface inlet at the lowest point in the yard — provides a direct outlet for stormwater that pools on the site.
Complexity: Low · 1–4 weeks

Backflow Preventer + Gate Valve
A backflow preventer on the building sewer lets wastewater flow out to the street but closes automatically when the municipal sewer surcharges, preventing sewage from backing up into the basement.
Complexity: Moderate · 2–6 weeks

Sewer Line Video Inspection
A licensed plumber runs a camera through the building sewer from a cleanout to the street connection, recording the condition of the pipe.
Complexity: Low · 1–2 weeks
Which of these fit your lot?
Your Flood Form rates your property’s exposure and recommends the measures suited to it.
City sewer and stormwater work in East Williamsburg (NCB-012)
The city has 4 sewer, stormwater and coastal projects planned, in design or under construction in this area. Another 6 projects are upgrading the treatment plant this area drains to.
4
City projects planned or underway
$403M
City budget for these projects
- Sewer repair · Out to bid
Trench Restoration Brooklyn
ScheduleJun 2018 → Sep 2029Spending$4.8M of $67.9MNYC Design and Construction
- New and upgraded sewers · Stage not reported
Upgrade Combined SE on Knickerbocker Avenue, Central & Wilson Street
ScheduleStarts Jun 2027Spending$335M budgetNYC Environmental Protection
- Green infrastructure · Stage not reported
Construction of Green Infrastructure in NCB-014, Phase II
SchedulePast the city's forecast (Oct 2025)NYC Design and Construction
- Sewer repair · Stage not reported
Brooklyn Trench Restoration #10
SchedulePast the city's forecast (Feb 2026)NYC Design and Construction
Dates and dollars from the NYC Capital Projects Dashboard (May 2026 update) and the city's Capital Planning Database; street permits from NYC DOT, checked daily.
What does this mean for your property?
Projects like these work across a whole drainage area and take years to finish. They don't change how water reaches a building through its own sewer connection, doors or foundation, which is what a property-level plan addresses.
Questions about flooding in East Williamsburg (NCB-012)
What is the NCB-012 sewershed in East Williamsburg?
NCB-012 is the part of East Williamsburg, Brooklyn whose combined sewer leads to NYC DEP outfall NCB-012. Its 1,861 properties share that pipe for both rain and wastewater, so a heavy storm anywhere in the area uses up capacity for every block in it. When the pipe is over capacity, the overflow discharges to East River / Open Waters.
Which East Williamsburg sewershed has the most sewer backups?
East Williamsburg is split across two sewersheds. NCB-012 has the most sewer backup reports of the two: 81 in every 1,000 lots over the last 10 years. NCB-006 has 79. This page covers NCB-012, and its map outlines the blocks it includes.
Has street flooding been measured in East Williamsburg (NCB-012)?
Yes. One FloodNet street-flood sensor in NCB-012 has recorded 1 flood since it was installed, the deepest 0.5 inches. It came on March 12, 2026. FloodNet is a citywide network of sensors that measure water on the street.
Can properties in East Williamsburg (NCB-012) manage stormwater on site?
56% of lots in NCB-012 have yard area that legally qualifies for on-site infiltration, such as a drywell or rain garden. A lot without that room can still hold runoff with a detention tank or a blue roof.
Is East Williamsburg flooding right now?
The live check at the top of this page shows whether flooding is likely in East Williamsburg now. It combines National Weather Service flood alerts for Brooklyn, NYC DEP's modeled combined sewer overflow advisories, and the past three hours of rain. Most NYC sewers are designed for about 1.75 inches of rain an hour, so a heavy downpour can flood streets and basements on low blocks before any alert goes out. Report street flooding or a sewer backup to 311, and call 911 if anyone is in danger.
Nearby neighborhoods and sewersheds
- NCB-006East Williamsburg6,259 properties · 45% with Moderate or High stormwater exposure
- NCB-008Williamsburg938 properties · 56% with Moderate or High stormwater exposure
- NCB-013South Williamsburg267 properties · 29% with Moderate or High stormwater exposure
- NCB-007Williamsburg277 properties · 62% with Moderate or High stormwater exposure
- NCB-014Bedford-Stuyvesant16,178 properties · 40% with Moderate or High stormwater exposure