Is Murray Hill flooding right now?
Checking live flood alerts and sewer overflow conditions…
Murray Hill Flood Exposure · NYC DEP Combined Sewer Area NCM-038
Murray Hill, Manhattan - NCM-038
Properties in this area share the NCM-038 combined sewer — during moderate-to-heavy rain, runoff can exceed pipe capacity faster than it drains, which is what drives sewer backup exposure block by block. Here’s what that looks like for Murray Hill, Manhattan specifically.
NCM-038 is a combined sewer area covering 118 properties in Murray Hill, Manhattan. Flood Form rates 80% of them Moderate or High for stormwater, 3% for sewer backup, and 4% for coastal flooding. None rate that high for groundwater. 36% of lots have yard area that legally qualifies for on-site infiltration. The ground is fairly level here, typically about 34 ft. The median building dates to 1920. 45% of parcels sit over a historic stream or pond. NYC DEP models about 10 combined sewer overflows a year at its outfall.
See where your property stands
Flood exposure in Murray Hill (NCM-038)
The share of properties Flood Form rates Moderate or High for each type of flooding, on the same Minimal to High scale as an individual report.
80%
Stormwater exposure: Moderate or High
3%
Sewer Backup exposure: Moderate or High
0%
Groundwater exposure: Moderate or High
4%
Coastal exposure: Moderate or High
What sets Murray Hill (NCM-038) apart
The three figures on which NCM-038 differs most from the rest of NYC’s combined sewer areas.
80%
Properties with Moderate or High stormwater exposure
Higher than 98% of NYC's combined sewer areas. Heavy rain ponds on or flows across more lots here.
3%
Properties with Moderate or High sewer backup exposure
Lower than 94% of NYC's combined sewer areas. Few lots have the records or basements that point to backups.
97%
Average impervious cover per lot
Higher than 92% of NYC's combined sewer areas. More paved and built-over ground, so more rain becomes runoff.
Stats computed from Flood Form’s NYC parcel data as of October 14, 2026
The worst corner in Murray Hill
2nd Avenue & 2nd Avenue
Of the 7 four-way intersections Flood Form compared in NCM-038, the 28 lots within 100 meters of this one carry the highest average compound flood exposure: a score of 10.2, against 7.3 across the sewershed.
Moderate
Compound exposure
High
Stormwater exposure
Low
Sewer Backup exposure
Low
Groundwater exposure
Minimal
Coastal exposure
Ratings are for the average lot near the corner, on the same Minimal to High scale as a report
Common solutions for Murray Hill properties
The measures that most often suit conditions in NCM-038. An individual Flood Form picks the exact set for one lot. See all flood prevention solutions.

Downspout Diversion
Redirect roof downspouts away from the sewer system toward permeable yard areas, planters, or a rain barrel.
Complexity: Low · 1–4 weeks

Area Drain
A yard area drain — a surface inlet at the lowest point in the yard — provides a direct outlet for stormwater that pools on the site.
Complexity: Low · 1–4 weeks

Modular Drywell System
An NDS Flo-Well modular drywell system lets water soak into the ground on-site.
Complexity: Moderate · 1–3 weeks

Detention System
A detention cistern or underground storage tank temporarily holds stormwater runoff and releases it slowly after storm peaks subside.
Complexity: High · 3–6 months

Increase Permeable Area
On-site interventions include permeable paving for driveways and walkways, removing concrete from yard areas, and adding planted beds — reducing impervious coverage that limits the neighborhood's collective capacity to absorb rain.
Complexity: Low · Ongoing

Foundation Waterproofing
Exterior membrane waterproofing, interior footing drains, or crystalline waterproofing compounds address hydrostatic pressure against the foundation, depending on construction type.
Complexity: High · 3–6 months
Which of these fit your lot?
Your Flood Form rates your property’s exposure and recommends the measures suited to it.
Questions about flooding in Murray Hill (NCM-038)
What is the NCM-038 sewershed in Murray Hill?
NCM-038 is the part of Murray Hill, Manhattan whose combined sewer leads to NYC DEP outfall NCM-038. Its 118 properties share that pipe for both rain and wastewater, so a heavy storm anywhere in the area uses up capacity for every block in it.
Which Murray Hill sewershed has the most sewer backups?
Murray Hill is split across three sewersheds. NC-017 has the most sewer backup reports of the three: 67 in every 1,000 lots over the last 10 years. NCM-041 has 31. NCM-038 has 8. This page covers NCM-038, and its map outlines the blocks it includes.
Do properties in Murray Hill (NCM-038) report sewer backups?
Over the last 10 years, 8 in every 1,000 lots in NCM-038 filed a 311 sewer backup report, against a median of 76 across NYC's combined sewer areas. NYC DEP has not confirmed a problem in the city sewer behind any of them.
How exposed to flooding is Murray Hill (NCM-038)?
The most widespread exposure in NCM-038 is stormwater: Flood Form rates 80% of properties Moderate or High for it. The share is 3% for sewer backup and 4% for coastal flooding. These figures describe the whole area, and exposure varies lot by lot within it.
Is Murray Hill flooding right now?
The live check at the top of this page shows whether flooding is likely in Murray Hill now. It combines National Weather Service flood alerts for Manhattan, NYC DEP's modeled combined sewer overflow advisories, and the past three hours of rain. Most NYC sewers are designed for about 1.75 inches of rain an hour, so a heavy downpour can flood streets and basements on low blocks before any alert goes out. Report street flooding or a sewer backup to 311, and call 911 if anyone is in danger.
Nearby neighborhoods and sewersheds
- NC-017Murray Hill105 properties · 61% with Moderate or High stormwater exposure
- NCM-041Murray Hill765 properties · 46% with Moderate or High stormwater exposure
- NCM-037Midtown385 properties · 54% with Moderate or High stormwater exposure
- NCM-045Midtown South483 properties · 55% with Moderate or High stormwater exposure
- NCM-046Gramercy149 properties · 83% with Moderate or High stormwater exposure
- NCM-034Turtle Bay131 properties · 66% with Moderate or High stormwater exposure
