Skip to main content

Is College Point flooding right now?

Checking live flood alerts and sewer overflow conditions…

College Point Flood Exposure  ·  NYC DEP Combined Sewer Area TI-019

College Point, Queens - TI-019

Properties in this area share the TI-019 combined sewer — during moderate-to-heavy rain, runoff can exceed pipe capacity faster than it drains, which is what drives sewer backup exposure block by block. Here’s what that looks like for College Point, Queens specifically.

TI-019 is a combined sewer area covering 248 properties in College Point, Queens. Flood Form rates 29% of them Moderate or High for stormwater, 9% for sewer backup, 6% for groundwater, and 13% for coastal flooding. 97% of lots have yard area that legally qualifies for on-site infiltration. The ground slopes gently down, from about 51 ft to 14 ft, so runoff from higher blocks drains toward lower ones. The median building dates to 1945. NYC DEP models about 15 combined sewer overflows a year at its outfall.

See where your property stands

Sewershed TI-019
CSO Outfall
Stormwater Flooding
Historic Waterbody

Flood exposure in College Point (TI-019)

The share of properties Flood Form rates Moderate or High for each type of flooding, on the same Minimal to High scale as an individual report.

29%

Stormwater exposure: Moderate or High

9%

Sewer Backup exposure: Moderate or High

6%

Groundwater exposure: Moderate or High

13%

Coastal exposure: Moderate or High

What sets College Point (TI-019) apart

The three figures on which TI-019 differs most from the rest of NYC’s combined sewer areas.

96.8%

Legally eligible for on-site infiltration

Higher than 99% of NYC's combined sewer areas. More yards here have room to soak stormwater in.

1945

Median year built

Newer than 85% of NYC's combined sewer areas. Recent construction tends to have up-to-date drains and sewer connections.

75%

Average impervious cover per lot

Lower than 86% of NYC's combined sewer areas. More open ground to absorb rain.

Stats computed from Flood Form’s NYC parcel data as of October 14, 2026

Common solutions for College Point properties

The measures that most often suit conditions in TI-019. An individual Flood Form picks the exact set for one lot. See all flood prevention solutions.

  • Downspout Diversion illustration

    Downspout Diversion

    Redirect roof downspouts away from the sewer system toward permeable yard areas, planters, or a rain barrel.

    Complexity: Low  ·  1–4 weeks

  • Modular Drywell System illustration

    Modular Drywell System

    An NDS Flo-Well modular drywell system lets water soak into the ground on-site.

    Complexity: Moderate  ·  1–3 weeks

  • Rain Garden illustration

    Rain Garden

    A shallow planted depression that collects runoff from roofs and paved areas and lets it soak into the ground over a day or two.

    Complexity: Low  ·  1–3 weeks

  • Raised Threshold illustration

    Raised Threshold

    Raising a doorway threshold with a concrete step or raised sill keeps shallow surface water from entering at ground-level and below-grade doors.

    Complexity: Low  ·  1–2 weeks

  • Window Well illustration

    Window Well

    A lined enclosure around a below-grade basement window holds back soil and keeps surface water off the glass.

    Complexity: Low  ·  1–2 weeks

  • Increase Permeable Area illustration

    Increase Permeable Area

    On-site interventions include permeable paving for driveways and walkways, removing concrete from yard areas, and adding planted beds — reducing impervious coverage that limits the neighborhood's collective capacity to absorb rain.

    Complexity: Low  ·  Ongoing

Which of these fit your lot?

Your Flood Form rates your property’s exposure and recommends the measures suited to it.

Questions about flooding in College Point (TI-019)

What is the TI-019 sewershed in College Point?

TI-019 is the part of College Point, Queens whose combined sewer leads to NYC DEP outfall TI-019. Its 248 properties share that pipe for both rain and wastewater, so a heavy storm anywhere in the area uses up capacity for every block in it.

Which College Point sewershed has the most sewer backups?

College Point is split across six sewersheds. TI-016 has the most sewer backup reports of the six: 107 in every 1,000 lots over the last 10 years. The others range from 56 to 84. This page covers TI-019, at 65, and its map outlines the blocks it includes.

How exposed to flooding is College Point (TI-019)?

The most widespread exposure in TI-019 is stormwater: Flood Form rates 29% of properties Moderate or High for it. The share is 9% for sewer backup, 6% for groundwater and 13% for coastal flooding. These figures describe the whole area, and exposure varies lot by lot within it.

Can properties in College Point (TI-019) manage stormwater on site?

97% of lots in TI-019 have yard area that legally qualifies for on-site infiltration, such as a drywell or rain garden. A lot without that room can still hold runoff with a detention tank or a blue roof.

Is College Point flooding right now?

The live check at the top of this page shows whether flooding is likely in College Point now. It combines National Weather Service flood alerts for Queens, NYC DEP's modeled combined sewer overflow advisories, and the past three hours of rain. Most NYC sewers are designed for about 1.75 inches of rain an hour, so a heavy downpour can flood streets and basements on low blocks before any alert goes out. Report street flooding or a sewer backup to 311, and call 911 if anyone is in danger.

Nearby neighborhoods and sewersheds

Queens Flood Map →All NYC sewersheds →