Is East Elmhurst flooding right now?
Checking live flood alerts and sewer overflow conditions…
East Elmhurst Flood Exposure · NYC DEP Combined Sewer Area BB-007
East Elmhurst, Queens - BB-007
Properties in this area share the BB-007 combined sewer — during moderate-to-heavy rain, runoff can exceed pipe capacity faster than it drains, which is what drives sewer backup exposure block by block. Here’s what that looks like for East Elmhurst, Queens specifically.
BB-007 is a combined sewer area covering 1,033 properties in East Elmhurst, Queens. Flood Form rates 15% of them Moderate or High for stormwater, 11% for sewer backup, 2% for groundwater, and 1% for coastal flooding. 88% of lots have yard area that legally qualifies for on-site infiltration. The ground slopes gently down toward the north, from about 85 ft to 41 ft, so runoff from higher blocks drains toward lower ones. The median building dates to 1925. NYC DEP models about 64 combined sewer overflows a year at its outfall.
See where your property stands
Flood exposure in East Elmhurst (BB-007)
The share of properties Flood Form rates Moderate or High for each type of flooding, on the same Minimal to High scale as an individual report.
15%
Stormwater exposure: Moderate or High
11%
Sewer Backup exposure: Moderate or High
2%
Groundwater exposure: Moderate or High
1%
Coastal exposure: Moderate or High
What sets East Elmhurst (BB-007) apart
The three figures on which BB-007 differs most from the rest of NYC’s combined sewer areas.
15%
Properties with Moderate or High stormwater exposure
Lower than 96% of NYC's combined sewer areas. Few lots sit where heavy rain ponds or flows.
64
Sewer overflows a year at the outfall, as modeled by NYC DEP
Higher than 95% of NYC's combined sewer areas. The shared pipe overflows to the waterway often.
87.9%
Legally eligible for on-site infiltration
Higher than 86% of NYC's combined sewer areas. More yards here have room to soak stormwater in.
Stats computed from Flood Form’s NYC parcel data as of October 14, 2026
The worst corner in East Elmhurst
Butler Street & 25th Avenue
Of the 19 four-way intersections Flood Form compared in BB-007, the 10 lots within 50 meters of this one carry the highest average compound flood exposure: a score of 7.6, against 3.5 across the sewershed.
Moderate
Compound exposure
Moderate
Stormwater exposure
Low
Sewer Backup exposure
Minimal
Groundwater exposure
Minimal
Coastal exposure
Ratings are for the average lot near the corner, on the same Minimal to High scale as a report
Common solutions for East Elmhurst properties
The measures that most often suit conditions in BB-007. An individual Flood Form picks the exact set for one lot. See all flood prevention solutions.

Downspout Diversion
Redirect roof downspouts away from the sewer system toward permeable yard areas, planters, or a rain barrel.
Complexity: Low · 1–4 weeks

Modular Drywell System
An NDS Flo-Well modular drywell system lets water soak into the ground on-site.
Complexity: Moderate · 1–3 weeks

Rain Garden
A shallow planted depression that collects runoff from roofs and paved areas and lets it soak into the ground over a day or two.
Complexity: Low · 1–3 weeks

Increase Permeable Area
On-site interventions include permeable paving for driveways and walkways, removing concrete from yard areas, and adding planted beds — reducing impervious coverage that limits the neighborhood's collective capacity to absorb rain.
Complexity: Low · Ongoing

Detention System
A detention cistern or underground storage tank temporarily holds stormwater runoff and releases it slowly after storm peaks subside.
Complexity: High · 3–6 months

Area Drain
A yard area drain — a surface inlet at the lowest point in the yard — provides a direct outlet for stormwater that pools on the site.
Complexity: Low · 1–4 weeks
Which of these fit your lot?
Your Flood Form rates your property’s exposure and recommends the measures suited to it.
Questions about flooding in East Elmhurst (BB-007)
What is the BB-007 sewershed in East Elmhurst?
BB-007 is the part of East Elmhurst, Queens whose combined sewer leads to NYC DEP outfall BB-007. Its 1,033 properties share that pipe for both rain and wastewater, so a heavy storm anywhere in the area uses up capacity for every block in it.
Do properties in East Elmhurst (BB-007) report sewer backups?
Over the last 10 years, 55 in every 1,000 lots in BB-007 filed a 311 sewer backup report, against a median of 76 across NYC's combined sewer areas. NYC DEP confirmed a problem in the city sewer, from rain overload to a blockage, at 10 in every 1,000 lots. The most reports came in 2023: 30.
How exposed to flooding is East Elmhurst (BB-007)?
The most widespread exposure in BB-007 is stormwater: Flood Form rates 15% of properties Moderate or High for it. The share is 11% for sewer backup, 2% for groundwater and 1% for coastal flooding. These figures describe the whole area, and exposure varies lot by lot within it.
Can properties in East Elmhurst (BB-007) manage stormwater on site?
88% of lots in BB-007 have yard area that legally qualifies for on-site infiltration, such as a drywell or rain garden. A lot without that room can still hold runoff with a detention tank or a blue roof.
Is East Elmhurst flooding right now?
The live check at the top of this page shows whether flooding is likely in East Elmhurst now. It combines National Weather Service flood alerts for Queens, NYC DEP's modeled combined sewer overflow advisories, and the past three hours of rain. Most NYC sewers are designed for about 1.75 inches of rain an hour, so a heavy downpour can flood streets and basements on low blocks before any alert goes out. Report street flooding or a sewer backup to 311, and call 911 if anyone is in danger.
Nearby neighborhoods and sewersheds
- BB-008Corona10,580 properties · 33% with Moderate or High stormwater exposure
- TI-014College Point272 properties · 4% with Moderate or High stormwater exposure
- TI-015College Point215 properties · 11% with Moderate or High stormwater exposure
- TI-018College Point166 properties · 27% with Moderate or High stormwater exposure
- TI-016College Point1,285 properties · 40% with Moderate or High stormwater exposure
- BB-003Steinway1,740 properties · 32% with Moderate or High stormwater exposure
