Skip to main content

Sewershed BB-008  ·  NYC DEP Combined Sewer Overflow Tributary Area

BB-008 - Corona, Queens

Properties in this area share the BB-008 combined sewer — during moderate-to-heavy rain, runoff can exceed pipe capacity faster than it drains, which is what drives sewer backup exposure block by block. Here’s what that looks like for Corona, Queens specifically.

BB-008 is a combined sewer area covering 10,580 properties in Corona, Queens. Flood Form rates 32% of them Moderate or High for stormwater exposure, and 2% for groundwater. 77% of lots have yard area that legally qualifies for on-site infiltration. Ground elevation is typically 55 ft. The median building dates to 1930. According to NYC DEP green infrastructure records, this sewershed drains to Flushing Bay. NYC DEP has built 241 green infrastructure assets here.

10,580

Properties in sewershed

77.1%

Legally eligible for on-site infiltration

32%

Stormwater exposure: Moderate or High

2%

Groundwater exposure: Moderate or High

What sets BB-008 apart

55 ft

Median ground elevation

92%

Average impervious cover per lot

1930

Median year built

0%

Properties over a historic stream or pond

Stats computed from Flood Form’s NYC parcel data as of October 9, 2026

Common solutions for Corona properties

Downspout Diversion

Redirects roof runoff away from the combined sewer and into landscaped or permeable areas on the lot.

Infiltration System

Drywells or infiltration chambers that let stormwater soak into the ground on-site instead of entering the sewer.

Detention System

Holds stormwater temporarily and releases it slowly, reducing peak flow into the combined sewer during a storm.

Drain Improvement

Upgrades yard, area, or foundation drains so water is carried away from the building instead of pooling.

Foundation Waterproofing

Protects the foundation from groundwater intrusion, relevant where groundwater exposure runs high.

Want to see where your specific property stands?

Get Your Property’s Flood Form