Skip to main content

Sewershed BB-023  ·  NYC DEP Combined Sewer Overflow Tributary Area

BB-023 - Long Island City, Queens

Properties in this area share the BB-023 combined sewer — during moderate-to-heavy rain, runoff can exceed pipe capacity faster than it drains, which is what drives sewer backup exposure block by block. Here’s what that looks like for Long Island City, Queens specifically.

BB-023 is a combined sewer area covering 282 properties in Long Island City, Queens. Flood Form rates 73% of them Moderate or High for stormwater exposure, and 50% for groundwater. 50% of lots have yard area that legally qualifies for on-site infiltration. Ground elevation is typically 14 ft. The median building dates to 1930. 38% of parcels sit over a historic stream or pond.

282

Properties in sewershed

50%

Legally eligible for on-site infiltration

73%

Stormwater exposure: Moderate or High

50%

Groundwater exposure: Moderate or High

What sets BB-023 apart

14 ft

Median ground elevation

89%

Average impervious cover per lot

1930

Median year built

38%

Properties over a historic stream or pond

Stats computed from Flood Form’s NYC parcel data as of October 9, 2026

Common solutions for Long Island City properties

Downspout Diversion

Redirects roof runoff away from the combined sewer and into landscaped or permeable areas on the lot.

Infiltration System

Drywells or infiltration chambers that let stormwater soak into the ground on-site instead of entering the sewer.

Detention System

Holds stormwater temporarily and releases it slowly, reducing peak flow into the combined sewer during a storm.

Drain Improvement

Upgrades yard, area, or foundation drains so water is carried away from the building instead of pooling.

Foundation Waterproofing

Protects the foundation from groundwater intrusion, relevant where groundwater exposure runs high.

Want to see where your specific property stands?

Get Your Property’s Flood Form