Skip to main content

Is Bushwick flooding right now?

Checking live flood alerts and sewer overflow conditions…

Bushwick Flood Exposure  ·  NYC DEP Combined Sewer Area NCB-015

Bushwick, Brooklyn - NCB-015

Properties in this area share the NCB-015 combined sewer — during moderate-to-heavy rain, runoff can exceed pipe capacity faster than it drains, which is what drives sewer backup exposure block by block. Here’s what that looks like for Bushwick, Brooklyn specifically.

NCB-015 is a combined sewer area covering 19,026 properties in Bushwick, Brooklyn. Flood Form rates 39% of them Moderate or High for stormwater, 26% for sewer backup, and 4% for groundwater. None rate that high for coastal flooding. 82% of lots have yard area that legally qualifies for on-site infiltration. The ground slopes gently down toward the north, from about 75 ft to 34 ft, so runoff from higher blocks drains toward lower ones. The median building dates to 1920. 10% of parcels sit over a historic stream or pond. According to NYC DEP green infrastructure records, this sewershed drains to Newtown Creek. NYC DEP has built 545 green infrastructure assets here. NYC DEP models about 28 combined sewer overflows a year at its outfall.

See where your property stands

Sewershed NCB-015
CSO Outfall
Stormwater Flooding
Historic Waterbody

Flood exposure in Bushwick (NCB-015)

The share of properties Flood Form rates Moderate or High for each type of flooding, on the same Minimal to High scale as an individual report.

39%

Stormwater exposure: Moderate or High

26%

Sewer Backup exposure: Moderate or High

4%

Groundwater exposure: Moderate or High

0%

Coastal exposure: Moderate or High

What sets Bushwick (NCB-015) apart

The three figures on which NCB-015 differs most from the rest of NYC’s combined sewer areas.

545

NYC DEP green infrastructure assets built

Higher than 97% of NYC's combined sewer areas. City-built rain gardens and similar assets already take some runoff here.

19,026

Properties in sewershed

Larger than 96% of NYC's combined sewer areas. Many lots share this one outfall.

26%

Properties with Moderate or High sewer backup exposure

Higher than 84% of NYC's combined sewer areas. Backups from the shared pipe are a concern on more lots here.

Stats computed from Flood Form’s NYC parcel data as of October 14, 2026

The worst corner in Bushwick

Woodbine Street & Wilson Avenue

Of the 318 four-way intersections Flood Form compared in NCB-015, the 13 lots within 50 meters of this one carry the highest average compound flood exposure: a score of 23.3, against 5.8 across the sewershed.

High

Compound exposure

High

Stormwater exposure

High

Sewer Backup exposure

Low

Groundwater exposure

Minimal

Coastal exposure

Ratings are for the average lot near the corner, on the same Minimal to High scale as a report

Common solutions for Bushwick properties

The measures that most often suit conditions in NCB-015. An individual Flood Form picks the exact set for one lot. See all flood prevention solutions.

  • Downspout Diversion illustration

    Downspout Diversion

    Redirect roof downspouts away from the sewer system toward permeable yard areas, planters, or a rain barrel.

    Complexity: Low  ·  1–4 weeks

  • Modular Drywell System illustration

    Modular Drywell System

    An NDS Flo-Well modular drywell system lets water soak into the ground on-site.

    Complexity: Moderate  ·  1–3 weeks

  • Rain Garden illustration

    Rain Garden

    A shallow planted depression that collects runoff from roofs and paved areas and lets it soak into the ground over a day or two.

    Complexity: Low  ·  1–3 weeks

  • Area Drain illustration

    Area Drain

    A yard area drain — a surface inlet at the lowest point in the yard — provides a direct outlet for stormwater that pools on the site.

    Complexity: Low  ·  1–4 weeks

  • Backflow Preventer + Gate Valve illustration

    Backflow Preventer + Gate Valve

    A backflow preventer on the building sewer lets wastewater flow out to the street but closes automatically when the municipal sewer surcharges, preventing sewage from backing up into the basement.

    Complexity: Moderate  ·  2–6 weeks

  • Sewer Line Video Inspection illustration

    Sewer Line Video Inspection

    A licensed plumber runs a camera through the building sewer from a cleanout to the street connection, recording the condition of the pipe.

    Complexity: Low  ·  1–2 weeks

Which of these fit your lot?

Your Flood Form rates your property’s exposure and recommends the measures suited to it.

City sewer and stormwater work in Bushwick (NCB-015)

The city has 3 sewer, stormwater and coastal projects planned, in design or under construction in this area. Another 6 projects are upgrading the treatment plant this area drains to.

3

City projects planned or underway

$67.9M

City budget for these projects

  • Sewer repair · Out to bid

    Trench Restoration Brooklyn

    ScheduleJun 2018 → Sep 2029
    Spending$4.8M of $67.9M

    NYC Design and Construction

  • Green infrastructure · Stage not reported

    Construction of Green Infrastructure in NCB-014, Phase II

    SchedulePast the city's forecast (Oct 2025)

    NYC Design and Construction

  • Sewer repair · Stage not reported

    Brooklyn Trench Restoration #10

    SchedulePast the city's forecast (Feb 2026)

    NYC Design and Construction

Dates and dollars from the NYC Capital Projects Dashboard (May 2026 update) and the city's Capital Planning Database; street permits from NYC DOT, checked daily.

What does this mean for your property?

Projects like these work across a whole drainage area and take years to finish. They don't change how water reaches a building through its own sewer connection, doors or foundation, which is what a property-level plan addresses.

Questions about flooding in Bushwick (NCB-015)

What is the NCB-015 sewershed in Bushwick?

NCB-015 is the part of Bushwick, Brooklyn whose combined sewer leads to NYC DEP outfall NCB-015. Its 19,026 properties share that pipe for both rain and wastewater, so a heavy storm anywhere in the area uses up capacity for every block in it. When the pipe is over capacity, the overflow discharges to Newtown Creek.

Do properties in Bushwick (NCB-015) report sewer backups?

Over the last 10 years, 88 in every 1,000 lots in NCB-015 filed a 311 sewer backup report, against a median of 75 across NYC's combined sewer areas. NYC DEP confirmed a problem in the city sewer, from rain overload to a blockage, at 20 in every 1,000 lots. The most reports came in 2021, the year of Ida: 536.

What causes sewer backups in Bushwick (NCB-015)?

Over the last 10 years, NYC DEP named a cause for 1,119 sewer backup reports in NCB-015: 55% traced to the property's own plumbing, 27% to heavy rain overloading the pipes, and 18% to a blockage or defect in the city sewer. When the cause is inside the property, a camera inspection of the house sewer line usually finds it.

Has street flooding been measured in Bushwick (NCB-015)?

Yes. 14 FloodNet street-flood sensors in NCB-015 have recorded 28 floods since they were installed, the deepest 25.1 inches. The most recent came on August 23, 2026. FloodNet is a citywide network of sensors that measure water on the street.

Is Bushwick flooding right now?

The live check at the top of this page shows whether flooding is likely in Bushwick now. It combines National Weather Service flood alerts for Brooklyn, NYC DEP's modeled combined sewer overflow advisories, and the past three hours of rain. Most NYC sewers are designed for about 1.75 inches of rain an hour, so a heavy downpour can flood streets and basements on low blocks before any alert goes out. Report street flooding or a sewer backup to 311, and call 911 if anyone is in danger.

Nearby neighborhoods and sewersheds

Brooklyn Flood Map →All NYC sewersheds →