Skip to main content

Is Turtle Bay flooding right now?

Checking live flood alerts and sewer overflow conditions…

Turtle Bay Flood Exposure  ·  NYC DEP Combined Sewer Area NCM-032

Turtle Bay, Manhattan - NCM-032

Properties in this area share the NCM-032 combined sewer — during moderate-to-heavy rain, runoff can exceed pipe capacity faster than it drains, which is what drives sewer backup exposure block by block. Here’s what that looks like for Turtle Bay, Manhattan specifically.

NCM-032 is a combined sewer area covering 156 properties in Turtle Bay, Manhattan. Flood Form rates 46% of them Moderate or High for stormwater, 1% for sewer backup, 12% for groundwater, and 6% for coastal flooding. 60% of lots have yard area that legally qualifies for on-site infiltration. The ground is fairly level here, typically about 54 ft. The median building dates to 1910. 3% of parcels sit over a historic stream or pond. NYC DEP models about 4 combined sewer overflows a year at its outfall.

See where your property stands

Sewershed NCM-032
CSO Outfall
Stormwater Flooding
Historic Waterbody

Flood exposure in Turtle Bay (NCM-032)

The share of properties Flood Form rates Moderate or High for each type of flooding, on the same Minimal to High scale as an individual report.

46%

Stormwater exposure: Moderate or High

1%

Sewer Backup exposure: Moderate or High

12%

Groundwater exposure: Moderate or High

6%

Coastal exposure: Moderate or High

What sets Turtle Bay (NCM-032) apart

The three figures on which NCM-032 differs most from the rest of NYC’s combined sewer areas.

1%

Properties with Moderate or High sewer backup exposure

Lower than 99% of NYC's combined sewer areas. Few lots have the records or basements that point to backups.

4

Sewer overflows a year at the outfall, as modeled by NYC DEP

Lower than 92% of NYC's combined sewer areas. The shared pipe seldom overflows to the waterway.

95%

Average impervious cover per lot

Higher than 83% of NYC's combined sewer areas. More paved and built-over ground, so more rain becomes runoff.

Stats computed from Flood Form’s NYC parcel data as of October 14, 2026

Common solutions for Turtle Bay properties

The measures that most often suit conditions in NCM-032. An individual Flood Form picks the exact set for one lot. See all flood prevention solutions.

  • Downspout Diversion illustration

    Downspout Diversion

    Redirect roof downspouts away from the sewer system toward permeable yard areas, planters, or a rain barrel.

    Complexity: Low  ·  1–4 weeks

  • Modular Drywell System illustration

    Modular Drywell System

    An NDS Flo-Well modular drywell system lets water soak into the ground on-site.

    Complexity: Moderate  ·  1–3 weeks

  • Rain Garden illustration

    Rain Garden

    A shallow planted depression that collects runoff from roofs and paved areas and lets it soak into the ground over a day or two.

    Complexity: Low  ·  1–3 weeks

  • Area Drain illustration

    Area Drain

    A yard area drain — a surface inlet at the lowest point in the yard — provides a direct outlet for stormwater that pools on the site.

    Complexity: Low  ·  1–4 weeks

  • Increase Permeable Area illustration

    Increase Permeable Area

    On-site interventions include permeable paving for driveways and walkways, removing concrete from yard areas, and adding planted beds — reducing impervious coverage that limits the neighborhood's collective capacity to absorb rain.

    Complexity: Low  ·  Ongoing

  • Foundation Waterproofing illustration

    Foundation Waterproofing

    Exterior membrane waterproofing, interior footing drains, or crystalline waterproofing compounds address hydrostatic pressure against the foundation, depending on construction type.

    Complexity: High  ·  3–6 months

Which of these fit your lot?

Your Flood Form rates your property’s exposure and recommends the measures suited to it.

Questions about flooding in Turtle Bay (NCM-032)

What is the NCM-032 sewershed in Turtle Bay?

NCM-032 is the part of Turtle Bay, Manhattan whose combined sewer leads to NYC DEP outfall NCM-032. Its 156 properties share that pipe for both rain and wastewater, so a heavy storm anywhere in the area uses up capacity for every block in it.

Which Turtle Bay sewershed has the most sewer backups?

Turtle Bay is split across two sewersheds. NCM-034 has the most sewer backup reports of the two: 61 in every 1,000 lots over the last 10 years. NCM-032 has 32. This page covers NCM-032, and its map outlines the blocks it includes.

Do properties in Turtle Bay (NCM-032) report sewer backups?

Over the last 10 years, 32 in every 1,000 lots in NCM-032 filed a 311 sewer backup report, against a median of 76 across NYC's combined sewer areas. NYC DEP has not confirmed a problem in the city sewer behind any of them.

Can properties in Turtle Bay (NCM-032) manage stormwater on site?

60% of lots in NCM-032 have yard area that legally qualifies for on-site infiltration, such as a drywell or rain garden. A lot without that room can still hold runoff with a detention tank or a blue roof.

Is Turtle Bay flooding right now?

The live check at the top of this page shows whether flooding is likely in Turtle Bay now. It combines National Weather Service flood alerts for Manhattan, NYC DEP's modeled combined sewer overflow advisories, and the past three hours of rain. Most NYC sewers are designed for about 1.75 inches of rain an hour, so a heavy downpour can flood streets and basements on low blocks before any alert goes out. Report street flooding or a sewer backup to 311, and call 911 if anyone is in danger.

Nearby neighborhoods and sewersheds

Manhattan Flood Map →All NYC sewersheds →