Is Upper East Side flooding right now?
Checking live flood alerts and sewer overflow conditions…
Upper East Side Flood Exposure · NYC DEP Combined Sewer Area NCM-036
Upper East Side, Manhattan - NCM-036
Properties in this area share the NCM-036 combined sewer — during moderate-to-heavy rain, runoff can exceed pipe capacity faster than it drains, which is what drives sewer backup exposure block by block. Here’s what that looks like for Upper East Side, Manhattan specifically.
NCM-036 is a combined sewer area covering 1,944 properties in Upper East Side, Manhattan. Flood Form rates 56% of them Moderate or High for stormwater, 8% for sewer backup, and 17% for groundwater. None rate that high for coastal flooding. 49% of lots have yard area that legally qualifies for on-site infiltration. The ground slopes gently down toward the south, from about 74 ft to 33 ft, so runoff from higher blocks drains toward lower ones. The median building dates to 1911. 25% of parcels sit over a historic stream or pond. NYC DEP models about 10 combined sewer overflows a year at its outfall.
See where your property stands
Flood exposure in Upper East Side (NCM-036)
The share of properties Flood Form rates Moderate or High for each type of flooding, on the same Minimal to High scale as an individual report.
56%
Stormwater exposure: Moderate or High
8%
Sewer Backup exposure: Moderate or High
17%
Groundwater exposure: Moderate or High
0%
Coastal exposure: Moderate or High
What sets Upper East Side (NCM-036) apart
The three figures on which NCM-036 differs most from the rest of NYC’s combined sewer areas.
95%
Average impervious cover per lot
Higher than 83% of NYC's combined sewer areas. More paved and built-over ground, so more rain becomes runoff.
17%
Properties with Moderate or High groundwater exposure
Higher than 82% of NYC's combined sewer areas. A shallow water table sits under more lots here.
56%
Properties with Moderate or High stormwater exposure
Higher than 82% of NYC's combined sewer areas. Heavy rain ponds on or flows across more lots here.
Stats computed from Flood Form’s NYC parcel data as of October 14, 2026
The worst corner in Upper East Side
East 49th Street & 2nd Avenue
Of the 7 four-way intersections Flood Form compared in NCM-036, the 11 lots within 50 meters of this one carry the highest average compound flood exposure: a score of 11.7, against 6.9 across the sewershed.
High
Compound exposure
High
Stormwater exposure
Low
Sewer Backup exposure
Low
Groundwater exposure
Minimal
Coastal exposure
Ratings are for the average lot near the corner, on the same Minimal to High scale as a report
Common solutions for Upper East Side properties
The measures that most often suit conditions in NCM-036. An individual Flood Form picks the exact set for one lot. See all flood prevention solutions.

Downspout Diversion
Redirect roof downspouts away from the sewer system toward permeable yard areas, planters, or a rain barrel.
Complexity: Low · 1–4 weeks

Area Drain
A yard area drain — a surface inlet at the lowest point in the yard — provides a direct outlet for stormwater that pools on the site.
Complexity: Low · 1–4 weeks

Modular Drywell System
An NDS Flo-Well modular drywell system lets water soak into the ground on-site.
Complexity: Moderate · 1–3 weeks

Detention System
A detention cistern or underground storage tank temporarily holds stormwater runoff and releases it slowly after storm peaks subside.
Complexity: High · 3–6 months

Increase Permeable Area
On-site interventions include permeable paving for driveways and walkways, removing concrete from yard areas, and adding planted beds — reducing impervious coverage that limits the neighborhood's collective capacity to absorb rain.
Complexity: Low · Ongoing

Foundation Waterproofing
Exterior membrane waterproofing, interior footing drains, or crystalline waterproofing compounds address hydrostatic pressure against the foundation, depending on construction type.
Complexity: High · 3–6 months
Which of these fit your lot?
Your Flood Form rates your property’s exposure and recommends the measures suited to it.
Questions about flooding in Upper East Side (NCM-036)
What is the NCM-036 sewershed in Upper East Side?
NCM-036 is the part of Upper East Side, Manhattan whose combined sewer leads to NYC DEP outfall NCM-036. Its 1,944 properties share that pipe for both rain and wastewater, so a heavy storm anywhere in the area uses up capacity for every block in it.
Which Upper East Side sewershed has the most sewer backups?
Upper East Side is split across two sewersheds. NCM-036 has the most sewer backup reports of the two: 57 in every 1,000 lots over the last 10 years. WI-008 has 52. This page covers NCM-036, and its map outlines the blocks it includes.
What causes sewer backups in Upper East Side (NCM-036)?
Over the last 10 years, NYC DEP named a cause for 51 sewer backup reports in NCM-036: 59% traced to the property's own plumbing, 33% to a blockage or defect in the city sewer, and 8% to heavy rain overloading the pipes. When the cause is inside the property, a camera inspection of the house sewer line usually finds it.
Can properties in Upper East Side (NCM-036) manage stormwater on site?
49% of lots in NCM-036 have yard area that legally qualifies for on-site infiltration, such as a drywell or rain garden. A lot without that room can still hold runoff with a detention tank or a blue roof.
Is Upper East Side flooding right now?
The live check at the top of this page shows whether flooding is likely in Upper East Side now. It combines National Weather Service flood alerts for Manhattan, NYC DEP's modeled combined sewer overflow advisories, and the past three hours of rain. Most NYC sewers are designed for about 1.75 inches of rain an hour, so a heavy downpour can flood streets and basements on low blocks before any alert goes out. Report street flooding or a sewer backup to 311, and call 911 if anyone is in danger.
Nearby neighborhoods and sewersheds
- WI-008Upper East Side1,184 properties · 31% with Moderate or High stormwater exposure
- NCM-032Turtle Bay156 properties · 46% with Moderate or High stormwater exposure
- NCM-034Turtle Bay131 properties · 66% with Moderate or High stormwater exposure
- NCM-005Lenox Hill392 properties · 38% with Moderate or High stormwater exposure
- NC-017Murray Hill105 properties · 61% with Moderate or High stormwater exposure
- NCM-037Midtown385 properties · 54% with Moderate or High stormwater exposure
