Skip to main content

Sewershed NCM-050  ·  NYC DEP Combined Sewer Overflow Tributary Area

NCM-050 - Chinatown, Manhattan

Properties in this area share the NCM-050 combined sewer — during moderate-to-heavy rain, runoff can exceed pipe capacity faster than it drains, which is what drives sewer backup exposure block by block. Here’s what that looks like for Chinatown, Manhattan specifically.

NCM-050 is a combined sewer area covering 1,193 properties in Chinatown, Manhattan. Flood Form rates 46% of them Moderate or High for stormwater exposure, and 9% for groundwater. 23% of lots have yard area that legally qualifies for on-site infiltration. Ground elevation is typically 36 ft. The median building dates to 1910. 18% of parcels sit over a historic stream or pond.

1,193

Properties in sewershed

23.4%

Legally eligible for on-site infiltration

46%

Stormwater exposure: Moderate or High

9%

Groundwater exposure: Moderate or High

What sets NCM-050 apart

36 ft

Median ground elevation

98%

Average impervious cover per lot

1910

Median year built

18%

Properties over a historic stream or pond

Stats computed from Flood Form’s NYC parcel data as of October 9, 2026

Common solutions for Chinatown properties

Downspout Diversion

Redirects roof runoff away from the combined sewer and into landscaped or permeable areas on the lot.

Infiltration System

Drywells or infiltration chambers that let stormwater soak into the ground on-site instead of entering the sewer.

Detention System

Holds stormwater temporarily and releases it slowly, reducing peak flow into the combined sewer during a storm.

Drain Improvement

Upgrades yard, area, or foundation drains so water is carried away from the building instead of pooling.

Foundation Waterproofing

Protects the foundation from groundwater intrusion, relevant where groundwater exposure runs high.

Want to see where your specific property stands?

Get Your Property’s Flood Form