Skip to main content

Sewershed NCM-076  ·  NYC DEP Combined Sewer Overflow Tributary Area

NCM-076 - West Village, Manhattan

Properties in this area share the NCM-076 combined sewer — during moderate-to-heavy rain, runoff can exceed pipe capacity faster than it drains, which is what drives sewer backup exposure block by block. Here’s what that looks like for West Village, Manhattan specifically.

NCM-076 is a combined sewer area covering 1,904 properties in West Village, Manhattan. Flood Form rates 50% of them Moderate or High for stormwater exposure, and 27% for groundwater. 47% of lots have yard area that legally qualifies for on-site infiltration. Ground elevation is typically 22 ft. The median building dates to 1887. 25% of parcels sit over a historic stream or pond.

1,904

Properties in sewershed

47.4%

Legally eligible for on-site infiltration

50%

Stormwater exposure: Moderate or High

27%

Groundwater exposure: Moderate or High

What sets NCM-076 apart

22 ft

Median ground elevation

92%

Average impervious cover per lot

1887

Median year built

25%

Properties over a historic stream or pond

Stats computed from Flood Form’s NYC parcel data as of October 9, 2026

Common solutions for West Village properties

Downspout Diversion

Redirects roof runoff away from the combined sewer and into landscaped or permeable areas on the lot.

Infiltration System

Drywells or infiltration chambers that let stormwater soak into the ground on-site instead of entering the sewer.

Detention System

Holds stormwater temporarily and releases it slowly, reducing peak flow into the combined sewer during a storm.

Drain Improvement

Upgrades yard, area, or foundation drains so water is carried away from the building instead of pooling.

Foundation Waterproofing

Protects the foundation from groundwater intrusion, relevant where groundwater exposure runs high.