Is Sunnyside flooding right now?
Checking live flood alerts and sewer overflow conditions…
Sunnyside Flood Exposure · NYC DEP Combined Sewer Area NCQ-029
Sunnyside, Queens - NCQ-029
Properties in this area share the NCQ-029 combined sewer — during moderate-to-heavy rain, runoff can exceed pipe capacity faster than it drains, which is what drives sewer backup exposure block by block. Here’s what that looks like for Sunnyside, Queens specifically.
NCQ-029 is a combined sewer area covering 216 properties in Sunnyside, Queens. Flood Form rates 21% of them Moderate or High for stormwater, 2% for sewer backup, and 1% for groundwater. None rate that high for coastal flooding. 43% of lots have yard area that legally qualifies for on-site infiltration. The ground slopes gently down toward the southwest, from about 97 ft to 57 ft, so runoff from higher blocks drains toward lower ones. The median building dates to 1930. 28% of parcels sit over a historic stream or pond. According to NYC DEP green infrastructure records, this sewershed drains to Newtown Creek. NYC DEP has built 16 green infrastructure assets here. NYC DEP models about 44 combined sewer overflows a year at its outfall.
See where your property stands
Flood exposure in Sunnyside (NCQ-029)
The share of properties Flood Form rates Moderate or High for each type of flooding, on the same Minimal to High scale as an individual report.
21%
Stormwater exposure: Moderate or High
2%
Sewer Backup exposure: Moderate or High
1%
Groundwater exposure: Moderate or High
0%
Coastal exposure: Moderate or High
What sets Sunnyside (NCQ-029) apart
The three figures on which NCQ-029 differs most from the rest of NYC’s combined sewer areas.
2%
Properties with Moderate or High sewer backup exposure
Lower than 95% of NYC's combined sewer areas. Few lots have the records or basements that point to backups.
21%
Properties with Moderate or High stormwater exposure
Lower than 92% of NYC's combined sewer areas. Few lots sit where heavy rain ponds or flows.
85 ft
Median ground elevation
Higher than 92% of NYC's combined sewer areas. High ground, where runoff drains away downhill.
Stats computed from Flood Form’s NYC parcel data as of October 14, 2026
The worst corner in Sunnyside
46th Street & 54th Avenue
Of the 3 four-way intersections Flood Form compared in NCQ-029, the 12 lots within 50 meters of this one carry the highest average compound flood exposure: a score of 8.6, against 2.7 across the sewershed.
Moderate
Compound exposure
High
Stormwater exposure
Low
Sewer Backup exposure
Low
Groundwater exposure
Minimal
Coastal exposure
Ratings are for the average lot near the corner, on the same Minimal to High scale as a report
Common solutions for Sunnyside properties
The measures that most often suit conditions in NCQ-029. An individual Flood Form picks the exact set for one lot. See all flood prevention solutions.

Downspout Diversion
Redirect roof downspouts away from the sewer system toward permeable yard areas, planters, or a rain barrel.
Complexity: Low · 1–4 weeks

Modular Drywell System
An NDS Flo-Well modular drywell system lets water soak into the ground on-site.
Complexity: Moderate · 1–3 weeks

Detention System
A detention cistern or underground storage tank temporarily holds stormwater runoff and releases it slowly after storm peaks subside.
Complexity: High · 3–6 months

Increase Permeable Area
On-site interventions include permeable paving for driveways and walkways, removing concrete from yard areas, and adding planted beds — reducing impervious coverage that limits the neighborhood's collective capacity to absorb rain.
Complexity: Low · Ongoing

Area Drain
A yard area drain — a surface inlet at the lowest point in the yard — provides a direct outlet for stormwater that pools on the site.
Complexity: Low · 1–4 weeks

Foundation Waterproofing
Exterior membrane waterproofing, interior footing drains, or crystalline waterproofing compounds address hydrostatic pressure against the foundation, depending on construction type.
Complexity: High · 3–6 months
Which of these fit your lot?
Your Flood Form rates your property’s exposure and recommends the measures suited to it.
Questions about flooding in Sunnyside (NCQ-029)
What is the NCQ-029 sewershed in Sunnyside?
NCQ-029 is the part of Sunnyside, Queens whose combined sewer leads to NYC DEP outfall NCQ-029. Its 216 properties share that pipe for both rain and wastewater, so a heavy storm anywhere in the area uses up capacity for every block in it. When the pipe is over capacity, the overflow discharges to Newtown Creek.
Which Sunnyside sewershed has the most sewer backups?
Sunnyside is split across three sewersheds. BB-026 has the most sewer backup reports of the three: 89 in every 1,000 lots over the last 10 years. BB-009 has 79. NCQ-029 has 23. This page covers NCQ-029, and its map outlines the blocks it includes.
Do properties in Sunnyside (NCQ-029) report sewer backups?
Over the last 10 years, 23 in every 1,000 lots in NCQ-029 filed a 311 sewer backup report, against a median of 76 across NYC's combined sewer areas. NYC DEP confirmed a problem in the city sewer, from rain overload to a blockage, at 5 in every 1,000 lots.
How exposed to flooding is Sunnyside (NCQ-029)?
The most widespread exposure in NCQ-029 is stormwater: Flood Form rates 21% of properties Moderate or High for it. The share is 2% for sewer backup and 1% for groundwater. These figures describe the whole area, and exposure varies lot by lot within it.
Is Sunnyside flooding right now?
The live check at the top of this page shows whether flooding is likely in Sunnyside now. It combines National Weather Service flood alerts for Queens, NYC DEP's modeled combined sewer overflow advisories, and the past three hours of rain. Most NYC sewers are designed for about 1.75 inches of rain an hour, so a heavy downpour can flood streets and basements on low blocks before any alert goes out. Report street flooding or a sewer backup to 311, and call 911 if anyone is in danger.
Nearby neighborhoods and sewersheds
- BB-009Sunnyside1,749 properties · 52% with Moderate or High stormwater exposure
- BB-026Sunnyside628 properties · 63% with Moderate or High stormwater exposure
- NCQ-077Maspeth5,791 properties · 43% with Moderate or High stormwater exposure
- NCB-027Greenpoint920 properties · 59% with Moderate or High stormwater exposure
- NCB-006East Williamsburg6,259 properties · 45% with Moderate or High stormwater exposure
- NCB-022Greenpoint318 properties · 39% with Moderate or High stormwater exposure
