Skip to main content

Is Borough Park flooding right now?

Checking live flood alerts and sewer overflow conditions…

Borough Park Flood Exposure  ·  NYC DEP Combined Sewer Area OH-002

Borough Park, Brooklyn - OH-002

Properties in this area share the OH-002 combined sewer — during moderate-to-heavy rain, runoff can exceed pipe capacity faster than it drains, which is what drives sewer backup exposure block by block. Here’s what that looks like for Borough Park, Brooklyn specifically.

OH-002 is a combined sewer area covering 17,937 properties in Borough Park, Brooklyn. Flood Form rates 35% of them Moderate or High for stormwater, 11% for sewer backup, and 1% for groundwater. None rate that high for coastal flooding. 70% of lots have yard area that legally qualifies for on-site infiltration. Ground elevation varies widely here: the land drops from about 121 ft to 49 ft, sloping down toward the southeast. Rain that falls uphill runs down the streets toward the low end, so properties there take on water from the blocks above as well as their own, and are the first to see ponding and sewer backups when the pipes fill. Properties higher up shed water downhill and pond less, so where a lot sits on the slope matters more here than any average for the area. The median building dates to 1925. 1% of parcels sit over a historic stream or pond. According to NYC DEP green infrastructure records, this sewershed drains to East River / Open Waters. NYC DEP has built 6 green infrastructure assets here. NYC DEP models about 40 combined sewer overflows a year at its outfall.

See where your property stands

Sewershed OH-002
CSO Outfall
Stormwater Flooding
Historic Waterbody

Flood exposure in Borough Park (OH-002)

The share of properties Flood Form rates Moderate or High for each type of flooding, on the same Minimal to High scale as an individual report.

35%

Stormwater exposure: Moderate or High

11%

Sewer Backup exposure: Moderate or High

1%

Groundwater exposure: Moderate or High

0%

Coastal exposure: Moderate or High

What sets Borough Park (OH-002) apart

The three figures on which OH-002 differs most from the rest of NYC’s combined sewer areas.

17,937

Properties in sewershed

Larger than 96% of NYC's combined sewer areas. Many lots share this one outfall.

72 ft

Elevation change from low to high ground

Steeper than 83% of NYC's combined sewer areas. Runoff from the higher blocks flows downhill onto the lower ones.

6

NYC DEP green infrastructure assets built

Higher than 76% of NYC's combined sewer areas. City-built rain gardens and similar assets already take some runoff here.

Stats computed from Flood Form’s NYC parcel data as of October 14, 2026

The worst corner in Borough Park

13th Avenue & 50th Street

Of the 271 four-way intersections Flood Form compared in OH-002, the 15 lots within 50 meters of this one carry the highest average compound flood exposure: a score of 17.7, against 4.3 across the sewershed.

High

Compound exposure

High

Stormwater exposure

Moderate

Sewer Backup exposure

Minimal

Groundwater exposure

Minimal

Coastal exposure

Ratings are for the average lot near the corner, on the same Minimal to High scale as a report

Common solutions for Borough Park properties

The measures that most often suit conditions in OH-002. An individual Flood Form picks the exact set for one lot. See all flood prevention solutions.

  • Downspout Diversion illustration

    Downspout Diversion

    Redirect roof downspouts away from the sewer system toward permeable yard areas, planters, or a rain barrel.

    Complexity: Low  ·  1–4 weeks

  • Modular Drywell System illustration

    Modular Drywell System

    An NDS Flo-Well modular drywell system lets water soak into the ground on-site.

    Complexity: Moderate  ·  1–3 weeks

  • Rain Garden illustration

    Rain Garden

    A shallow planted depression that collects runoff from roofs and paved areas and lets it soak into the ground over a day or two.

    Complexity: Low  ·  1–3 weeks

  • Area Drain illustration

    Area Drain

    A yard area drain — a surface inlet at the lowest point in the yard — provides a direct outlet for stormwater that pools on the site.

    Complexity: Low  ·  1–4 weeks

  • Increase Permeable Area illustration

    Increase Permeable Area

    On-site interventions include permeable paving for driveways and walkways, removing concrete from yard areas, and adding planted beds — reducing impervious coverage that limits the neighborhood's collective capacity to absorb rain.

    Complexity: Low  ·  Ongoing

  • Detention System illustration

    Detention System

    A detention cistern or underground storage tank temporarily holds stormwater runoff and releases it slowly after storm peaks subside.

    Complexity: High  ·  3–6 months

Which of these fit your lot?

Your Flood Form rates your property’s exposure and recommends the measures suited to it.

City sewer and stormwater work in Borough Park (OH-002)

The city has 6 sewer, stormwater and coastal projects planned, in design or under construction in this area. City sewer contractors hold 24 active street permits here today. Another 9 projects are upgrading the treatment plant this area drains to.

6

City projects planned or underway

24

Active street permits for city sewer work

$403M

City budget for these projects

  • Green infrastructure · Under construction

    Gravesend Bay Green Infrastructure, Phase III

    ScheduleAug 2017 → Feb 2029
    Spending$20.9M of $108M

    NYC Design and Construction

  • Green infrastructure · Under construction

    Gravesend Bay Green Infrastructure, Phase II

    SchedulePast the city's forecast (Aug 2026)
    Spending$33.3M of $51.7M

    NYC Design and Construction

  • Sewer repair · Out to bid

    Trench Restoration Brooklyn

    ScheduleJun 2018 → Sep 2029
    Spending$4.8M of $67.9M

    NYC Design and Construction

  • Green infrastructure · In design

    Green Infrastructure in Gravesend Bay CSO Tributary Area OH-15, Phase IV

    ScheduleJan 2019 → Feb 2031
    Spending$9.8M of $127M

    NYC Design and Construction

  • New and upgraded sewers · Planned

    Replacement and Rehabilitation of deep sewer manholes

    ScheduleDec 2024 → Jun 2030
    Spending$1.0M of $48.3M

    NYC Design and Construction

  • Sewer repair · Stage not reported

    Brooklyn Trench Restoration #10

    SchedulePast the city's forecast (Feb 2026)

    NYC Design and Construction

Dates and dollars from the NYC Capital Projects Dashboard (May 2026 update) and the city's Capital Planning Database; street permits from NYC DOT, checked daily.

What does this mean for your property?

Projects like these work across a whole drainage area and take years to finish. They don't change how water reaches a building through its own sewer connection, doors or foundation, which is what a property-level plan addresses.

Questions about flooding in Borough Park (OH-002)

What is the OH-002 sewershed in Borough Park?

OH-002 is the part of Borough Park, Brooklyn whose combined sewer leads to NYC DEP outfall OH-002. Its 17,937 properties share that pipe for both rain and wastewater, so a heavy storm anywhere in the area uses up capacity for every block in it. When the pipe is over capacity, the overflow discharges to East River / Open Waters.

Do properties in Borough Park (OH-002) report sewer backups?

Over the last 10 years, 43 in every 1,000 lots in OH-002 filed a 311 sewer backup report, against a median of 76 across NYC's combined sewer areas. NYC DEP confirmed a problem in the city sewer, from rain overload to a blockage, at 9 in every 1,000 lots. The most reports came in 2017: 152.

Has street flooding been measured in Borough Park (OH-002)?

Yes. Three FloodNet street-flood sensors in OH-002 have recorded 1 flood since they were installed, the deepest 3.9 inches. It came on October 30, 2025. FloodNet is a citywide network of sensors that measure water on the street.

How exposed to flooding is Borough Park (OH-002)?

The most widespread exposure in OH-002 is stormwater: Flood Form rates 35% of properties Moderate or High for it. The share is 11% for sewer backup and 1% for groundwater. These figures describe the whole area, and exposure varies lot by lot within it.

Is Borough Park flooding right now?

The live check at the top of this page shows whether flooding is likely in Borough Park now. It combines National Weather Service flood alerts for Brooklyn, NYC DEP's modeled combined sewer overflow advisories, and the past three hours of rain. Most NYC sewers are designed for about 1.75 inches of rain an hour, so a heavy downpour can flood streets and basements on low blocks before any alert goes out. Report street flooding or a sewer backup to 311, and call 911 if anyone is in danger.

Nearby neighborhoods and sewersheds

Brooklyn Flood Map →All NYC sewersheds →