Skip to main content

Is Sunset Park flooding right now?

Checking live flood alerts and sewer overflow conditions…

Sunset Park Flood Exposure  ·  NYC DEP Combined Sewer Area OH-004

Sunset Park, Brooklyn - OH-004

Properties in this area share the OH-004 combined sewer — during moderate-to-heavy rain, runoff can exceed pipe capacity faster than it drains, which is what drives sewer backup exposure block by block. Here’s what that looks like for Sunset Park, Brooklyn specifically.

OH-004 is a combined sewer area covering 4,117 properties in Sunset Park, Brooklyn. Flood Form rates 22% of them Moderate or High for stormwater, 24% for sewer backup, 15% for groundwater, and 1% for coastal flooding. 77% of lots have yard area that legally qualifies for on-site infiltration. Ground elevation varies widely here: the land drops from about 159 ft to 20 ft, sloping down toward the west. Rain that falls uphill runs down the streets toward the low end, so properties there take on water from the blocks above as well as their own, and are the first to see ponding and sewer backups when the pipes fill. Properties higher up shed water downhill and pond less, so where a lot sits on the slope matters more here than any average for the area. The median building dates to 1915. 33% of parcels sit over a historic stream or pond. According to NYC DEP green infrastructure records, this sewershed drains to East River / Open Waters. NYC DEP has built 6 green infrastructure assets here. NYC DEP models about 12 combined sewer overflows a year at its outfall.

See where your property stands

Sewershed OH-004
CSO Outfall
Stormwater Flooding
Historic Waterbody

Flood exposure in Sunset Park (OH-004)

The share of properties Flood Form rates Moderate or High for each type of flooding, on the same Minimal to High scale as an individual report.

22%

Stormwater exposure: Moderate or High

24%

Sewer Backup exposure: Moderate or High

15%

Groundwater exposure: Moderate or High

1%

Coastal exposure: Moderate or High

What sets Sunset Park (OH-004) apart

The three figures on which OH-004 differs most from the rest of NYC’s combined sewer areas.

139 ft

Elevation change from low to high ground

Steeper than 96% of NYC's combined sewer areas. Runoff from the higher blocks flows downhill onto the lower ones.

22%

Properties with Moderate or High stormwater exposure

Lower than 90% of NYC's combined sewer areas. Few lots sit where heavy rain ponds or flows.

4,117

Properties in sewershed

Larger than 83% of NYC's combined sewer areas. Many lots share this one outfall.

Stats computed from Flood Form’s NYC parcel data as of October 14, 2026

The worst corner in Sunset Park

A corner on 4th Avenue

Of the 43 four-way intersections Flood Form compared in OH-004, the 12 lots within 50 meters of this one carry the highest average compound flood exposure: a score of 19.9, against 4.8 across the sewershed.

High

Compound exposure

High

Stormwater exposure

High

Sewer Backup exposure

Low

Groundwater exposure

Minimal

Coastal exposure

Ratings are for the average lot near the corner, on the same Minimal to High scale as a report

Common solutions for Sunset Park properties

The measures that most often suit conditions in OH-004. An individual Flood Form picks the exact set for one lot. See all flood prevention solutions.

  • Downspout Diversion illustration

    Downspout Diversion

    Redirect roof downspouts away from the sewer system toward permeable yard areas, planters, or a rain barrel.

    Complexity: Low  ·  1–4 weeks

  • Modular Drywell System illustration

    Modular Drywell System

    An NDS Flo-Well modular drywell system lets water soak into the ground on-site.

    Complexity: Moderate  ·  1–3 weeks

  • Rain Garden illustration

    Rain Garden

    A shallow planted depression that collects runoff from roofs and paved areas and lets it soak into the ground over a day or two.

    Complexity: Low  ·  1–3 weeks

  • Backflow Preventer + Gate Valve illustration

    Backflow Preventer + Gate Valve

    A backflow preventer on the building sewer lets wastewater flow out to the street but closes automatically when the municipal sewer surcharges, preventing sewage from backing up into the basement.

    Complexity: Moderate  ·  2–6 weeks

  • Sewer Line Video Inspection illustration

    Sewer Line Video Inspection

    A licensed plumber runs a camera through the building sewer from a cleanout to the street connection, recording the condition of the pipe.

    Complexity: Low  ·  1–2 weeks

  • Foundation Waterproofing illustration

    Foundation Waterproofing

    Exterior membrane waterproofing, interior footing drains, or crystalline waterproofing compounds address hydrostatic pressure against the foundation, depending on construction type.

    Complexity: High  ·  3–6 months

Which of these fit your lot?

Your Flood Form rates your property’s exposure and recommends the measures suited to it.

City sewer and stormwater work in Sunset Park (OH-004)

The city has 4 sewer, stormwater and coastal projects planned, in design or under construction in this area. City sewer contractors hold 33 active street permits here today. Another 9 projects are upgrading the treatment plant this area drains to.

4

City projects planned or underway

33

Active street permits for city sewer work

$231M

City budget for these projects

  • Green infrastructure · Out to bid

    Gravesend Bay Green Infrastructure, Phase I

    ScheduleAug 2017 → Jan 2030
    Spending$11.4M of $104M

    NYC Design and Construction

  • Sewage pumping · In design

    19th Street Pumping Station

    ScheduleNov 2019 → Jun 2031
    Spending$100K of $28.1M

    NYC Environmental Protection

  • New and upgraded sewers · Planned

    Replacement and Rehabilitation of deep sewer manholes

    ScheduleDec 2024 → Jun 2030
    Spending$1.0M of $48.3M

    NYC Design and Construction

  • New and upgraded sewers · Stage not reported

    Prospect Park BMP bound by Prospect Park W & Eastern Pkwy BK

    ScheduleStarts Jun 2028
    Spending$50.0M budget

    NYC Environmental Protection

Dates and dollars from the NYC Capital Projects Dashboard (May 2026 update) and the city's Capital Planning Database; street permits from NYC DOT, checked daily.

What does this mean for your property?

Projects like these work across a whole drainage area and take years to finish. They don't change how water reaches a building through its own sewer connection, doors or foundation, which is what a property-level plan addresses.

Questions about flooding in Sunset Park (OH-004)

What is the OH-004 sewershed in Sunset Park?

OH-004 is the part of Sunset Park, Brooklyn whose combined sewer leads to NYC DEP outfall OH-004. Its 4,117 properties share that pipe for both rain and wastewater, so a heavy storm anywhere in the area uses up capacity for every block in it. When the pipe is over capacity, the overflow discharges to East River / Open Waters.

Which Sunset Park sewershed has the most sewer backups?

Sunset Park is split across two sewersheds. OH-004 has the most sewer backup reports of the two: 77 in every 1,000 lots over the last 10 years. OH-003 has 65. This page covers OH-004, and its map outlines the blocks it includes.

Has street flooding been measured in Sunset Park (OH-004)?

Yes. Two FloodNet street-flood sensors in OH-004 have recorded 6 floods since they were installed, the deepest 1.1 inches. The most recent came on August 7, 2026. FloodNet is a citywide network of sensors that measure water on the street.

How exposed to flooding is Sunset Park (OH-004)?

The most widespread exposure in OH-004 is sewer backup: Flood Form rates 24% of properties Moderate or High for it. The share is 22% for stormwater, 15% for groundwater and 1% for coastal flooding. These figures describe the whole area, and exposure varies lot by lot within it.

Is Sunset Park flooding right now?

The live check at the top of this page shows whether flooding is likely in Sunset Park now. It combines National Weather Service flood alerts for Brooklyn, NYC DEP's modeled combined sewer overflow advisories, and the past three hours of rain. Most NYC sewers are designed for about 1.75 inches of rain an hour, so a heavy downpour can flood streets and basements on low blocks before any alert goes out. Report street flooding or a sewer backup to 311, and call 911 if anyone is in danger.

Nearby neighborhoods and sewersheds

Brooklyn Flood Map →All NYC sewersheds →