Park Slope, Brooklyn - OH-006
Properties in this area share the OH-006 combined sewer — during moderate-to-heavy rain, runoff can exceed pipe capacity faster than it drains, which is what drives sewer backup exposure block by block. Here’s what that looks like for Park Slope, Brooklyn specifically.
OH-006 is a combined sewer area covering 3,208 properties in Park Slope, Brooklyn. Flood Form rates 27% of them Moderate or High for stormwater, 27% for sewer backup, 14% for groundwater, and 1% for coastal flooding. 78% of lots have yard area that legally qualifies for on-site infiltration. Ground elevation varies widely here: the land drops from about 152 ft to 23 ft, sloping down toward the northwest. Rain that falls uphill runs down the streets toward the low end, so properties there take on water from the blocks above as well as their own, and are the first to see ponding and sewer backups when the pipes fill. Properties higher up shed water downhill and pond less, so where a lot sits on the slope matters more here than any average for the area. The median building dates to 1901. 40% of parcels sit over a historic stream or pond. NYC DEP models about 35 combined sewer overflows a year at its outfall.
See where your property stands
Flood exposure in Park Slope (OH-006)
The share of properties Flood Form rates Moderate or High for each type of flooding, on the same Minimal to High scale as an individual report.
27%
Stormwater exposure: Moderate or High
27%
Sewer Backup exposure: Moderate or High
14%
Groundwater exposure: Moderate or High
1%
Coastal exposure: Moderate or High
What sets Park Slope (OH-006) apart
The three figures on which OH-006 differs most from the rest of NYC’s combined sewer areas.
129 ft
Elevation change from low to high ground
Steeper than 95% of NYC's combined sewer areas. Runoff from the higher blocks flows downhill onto the lower ones.
1901
Median year built
Older than 90% of NYC's combined sewer areas. Buildings of this age tend to have aging drains and sewer connections.
40%
Properties over a historic stream or pond
Higher than 88% of NYC's combined sewer areas. Buried waterways still steer groundwater under these blocks.
Stats computed from Flood Form’s NYC parcel data as of October 14, 2026
The worst corner in Park Slope
3rd Avenue & 7th Street
Of the 50 four-way intersections Flood Form compared in OH-006, the 10 lots within 50 meters of this one carry the highest average compound flood exposure: a score of 18.5, against 5.3 across the sewershed.
High
Compound exposure
High
Stormwater exposure
Moderate
Sewer Backup exposure
Moderate
Groundwater exposure
Low
Coastal exposure
Ratings are for the average lot near the corner, on the same Minimal to High scale as a report
Common solutions for Park Slope properties
The measures that most often suit conditions in OH-006. An individual Flood Form picks the exact set for one lot. See all flood prevention solutions.

Downspout Diversion
Redirect roof downspouts away from the sewer system toward permeable yard areas, planters, or a rain barrel.
Complexity: Low · 1–4 weeks

Modular Drywell System
An NDS Flo-Well modular drywell system lets water soak into the ground on-site.
Complexity: Moderate · 1–3 weeks

Rain Garden
A shallow planted depression that collects runoff from roofs and paved areas and lets it soak into the ground over a day or two.
Complexity: Low · 1–3 weeks

Backflow Preventer + Gate Valve
A backflow preventer on the building sewer lets wastewater flow out to the street but closes automatically when the municipal sewer surcharges, preventing sewage from backing up into the basement.
Complexity: Moderate · 2–6 weeks

Sewer Line Video Inspection
A licensed plumber runs a camera through the building sewer from a cleanout to the street connection, recording the condition of the pipe.
Complexity: Low · 1–2 weeks

Foundation Waterproofing
Exterior membrane waterproofing, interior footing drains, or crystalline waterproofing compounds address hydrostatic pressure against the foundation, depending on construction type.
Complexity: High · 3–6 months
Which of these fit your lot?
Your Flood Form rates your property’s exposure and recommends the measures suited to it.
City sewer and stormwater work in Park Slope (OH-006)
The city has 4 sewer, stormwater and coastal projects planned, in design or under construction in this area. City sewer contractors hold 2 active street permits here today. Another 9 projects are upgrading the treatment plant this area drains to.
4
City projects planned or underway
2
Active street permits for city sewer work
$162M
City budget for these projects
- New and upgraded sewers · Under construction
Combined Sewer and Chambers in 7th Street, Brooklyn
SchedulePast the city's forecast (Sep 2026)Spending$12.5M of $16.4MNYC Design and Construction
- Sewer repair · Out to bid
Trench Restoration Brooklyn
ScheduleJun 2018 → Sep 2029Spending$4.8M of $67.9MNYC Design and Construction
- Sewage pumping · In design
19th Street Pumping Station
ScheduleNov 2019 → Jun 2031Spending$100K of $28.1MNYC Environmental Protection
- New and upgraded sewers · Stage not reported
Prospect Park BMP bound by Prospect Park W & Eastern Pkwy BK
ScheduleStarts Jun 2028Spending$50.0M budgetNYC Environmental Protection
Dates and dollars from the NYC Capital Projects Dashboard (May 2026 update) and the city's Capital Planning Database; street permits from NYC DOT, checked daily.
What does this mean for your property?
Projects like these work across a whole drainage area and take years to finish. They don't change how water reaches a building through its own sewer connection, doors or foundation, which is what a property-level plan addresses.
Questions about flooding in Park Slope (OH-006)
What is the OH-006 sewershed in Park Slope?
OH-006 is the part of Park Slope, Brooklyn whose combined sewer leads to NYC DEP outfall OH-006. Its 3,208 properties share that pipe for both rain and wastewater, so a heavy storm anywhere in the area uses up capacity for every block in it.
Which Park Slope sewershed has the most sewer backups?
Park Slope is split across two sewersheds. OH-007 has the most sewer backup reports of the two: 86 in every 1,000 lots over the last 10 years. OH-006 has 82. This page covers OH-006, and its map outlines the blocks it includes.
What causes sewer backups in Park Slope (OH-006)?
Over the last 10 years, NYC DEP named a cause for 186 sewer backup reports in OH-006: 47% traced to heavy rain overloading the pipes, 44% to the property's own plumbing, and 10% to a blockage or defect in the city sewer. Rain overload is what a backwater valve guards against: it closes when sewage pushes back up the line.
How exposed to flooding is Park Slope (OH-006)?
The most widespread exposure in OH-006 is stormwater: Flood Form rates 27% of properties Moderate or High for it. The share is 27% for sewer backup, 14% for groundwater and 1% for coastal flooding. These figures describe the whole area, and exposure varies lot by lot within it.
Is Park Slope flooding right now?
The live check at the top of this page shows whether flooding is likely in Park Slope now. It combines National Weather Service flood alerts for Brooklyn, NYC DEP's modeled combined sewer overflow advisories, and the past three hours of rain. Most NYC sewers are designed for about 1.75 inches of rain an hour, so a heavy downpour can flood streets and basements on low blocks before any alert goes out. Report street flooding or a sewer backup to 311, and call 911 if anyone is in danger.
Nearby neighborhoods and sewersheds
- OH-007Park Slope3,227 properties · 24% with Moderate or High stormwater exposure
- OH-005Gowanus336 properties · 81% with Moderate or High stormwater exposure
- OH-004Sunset Park4,117 properties · 22% with Moderate or High stormwater exposure
- RH-031Carroll Gardens324 properties · 39% with Moderate or High stormwater exposure
- RH-035Carroll Gardens815 properties · 25% with Moderate or High stormwater exposure
- RH-030Carroll Gardens482 properties · 46% with Moderate or High stormwater exposure