Is Mariner's Harbor flooding right now?
Checking live flood alerts and sewer overflow conditions…
Mariner's Harbor Flood Exposure · NYC DEP Combined Sewer Area PR-026
Mariner's Harbor, Staten Island - PR-026
Properties in this area share the PR-026 combined sewer — during moderate-to-heavy rain, runoff can exceed pipe capacity faster than it drains, which is what drives sewer backup exposure block by block. Here’s what that looks like for Mariner's Harbor, Staten Island specifically.
PR-026 is a combined sewer area covering 6,200 properties in Mariner's Harbor, Staten Island. Flood Form rates 28% of them Moderate or High for stormwater, 22% for sewer backup, 2% for groundwater, and 4% for coastal flooding. 94% of lots have yard area that legally qualifies for on-site infiltration. The ground slopes gently down toward the northwest, from about 44 ft to 16 ft, so runoff from higher blocks drains toward lower ones. The median building dates to 1978. 6% of parcels sit over a historic stream or pond. According to NYC DEP green infrastructure records, this sewershed drains to East River / Open Waters. NYC DEP has built 1 green infrastructure asset here. NYC DEP models about 6 combined sewer overflows a year at its outfall.
See where your property stands
Flood exposure in Mariner's Harbor (PR-026)
The share of properties Flood Form rates Moderate or High for each type of flooding, on the same Minimal to High scale as an individual report.
28%
Stormwater exposure: Moderate or High
22%
Sewer Backup exposure: Moderate or High
2%
Groundwater exposure: Moderate or High
4%
Coastal exposure: Moderate or High
What sets Mariner's Harbor (PR-026) apart
The three figures on which PR-026 differs most from the rest of NYC’s combined sewer areas.
1978
Median year built
Newer than 99% of NYC's combined sewer areas. Recent construction tends to have up-to-date drains and sewer connections.
66%
Average impervious cover per lot
Lower than 94% of NYC's combined sewer areas. More open ground to absorb rain.
93.9%
Legally eligible for on-site infiltration
Higher than 94% of NYC's combined sewer areas. More yards here have room to soak stormwater in.
Stats computed from Flood Form’s NYC parcel data as of October 14, 2026
The worst corner in Mariner's Harbor
Kirshon Avenue & Arlene Street
Of the 48 four-way intersections Flood Form compared in PR-026, the 10 lots within 50 meters of this one carry the highest average compound flood exposure: a score of 12.1, against 4.5 across the sewershed.
High
Compound exposure
High
Stormwater exposure
Low
Sewer Backup exposure
Minimal
Groundwater exposure
Minimal
Coastal exposure
Ratings are for the average lot near the corner, on the same Minimal to High scale as a report
Common solutions for Mariner's Harbor properties
The measures that most often suit conditions in PR-026. An individual Flood Form picks the exact set for one lot. See all flood prevention solutions.

Downspout Diversion
Redirect roof downspouts away from the sewer system toward permeable yard areas, planters, or a rain barrel.
Complexity: Low · 1–4 weeks

Modular Drywell System
An NDS Flo-Well modular drywell system lets water soak into the ground on-site.
Complexity: Moderate · 1–3 weeks

Rain Garden
A shallow planted depression that collects runoff from roofs and paved areas and lets it soak into the ground over a day or two.
Complexity: Low · 1–3 weeks

Backflow Preventer + Gate Valve
A backflow preventer on the building sewer lets wastewater flow out to the street but closes automatically when the municipal sewer surcharges, preventing sewage from backing up into the basement.
Complexity: Moderate · 2–6 weeks

Sewer Line Video Inspection
A licensed plumber runs a camera through the building sewer from a cleanout to the street connection, recording the condition of the pipe.
Complexity: Low · 1–2 weeks

Detention System
A detention cistern or underground storage tank temporarily holds stormwater runoff and releases it slowly after storm peaks subside.
Complexity: High · 3–6 months
Which of these fit your lot?
Your Flood Form rates your property’s exposure and recommends the measures suited to it.
Questions about flooding in Mariner's Harbor (PR-026)
What is the PR-026 sewershed in Mariner's Harbor?
PR-026 is the part of Mariner's Harbor, Staten Island whose combined sewer leads to NYC DEP outfall PR-026. Its 6,200 properties share that pipe for both rain and wastewater, so a heavy storm anywhere in the area uses up capacity for every block in it. When the pipe is over capacity, the overflow discharges to East River / Open Waters.
Which Mariner's Harbor sewershed has the most sewer backups?
Mariner's Harbor is split across two sewersheds. PR-027 has the most sewer backup reports of the two: 85 in every 1,000 lots over the last 10 years. PR-026 has 80. This page covers PR-026, and its map outlines the blocks it includes.
How exposed to flooding is Mariner's Harbor (PR-026)?
The most widespread exposure in PR-026 is stormwater: Flood Form rates 28% of properties Moderate or High for it. The share is 22% for sewer backup, 2% for groundwater and 4% for coastal flooding. These figures describe the whole area, and exposure varies lot by lot within it.
Can properties in Mariner's Harbor (PR-026) manage stormwater on site?
94% of lots in PR-026 have yard area that legally qualifies for on-site infiltration, such as a drywell or rain garden. A lot without that room can still hold runoff with a detention tank or a blue roof.
Is Mariner's Harbor flooding right now?
The live check at the top of this page shows whether flooding is likely in Mariner's Harbor now. It combines National Weather Service flood alerts for Staten Island, NYC DEP's modeled combined sewer overflow advisories, and the past three hours of rain. Most NYC sewers are designed for about 1.75 inches of rain an hour, so a heavy downpour can flood streets and basements on low blocks before any alert goes out. Report street flooding or a sewer backup to 311, and call 911 if anyone is in danger.
Nearby neighborhoods and sewersheds
- PR-027Mariner's Harbor306 properties · 13% with Moderate or High stormwater exposure
- PR-028Graniteville598 properties · 25% with Moderate or High stormwater exposure
- PR-029Todt Hill9,821 properties · 41% with Moderate or High stormwater exposure
- PR-037Port Richmond346 properties · 38% with Moderate or High stormwater exposure
- PR-006New Brighton231 properties · 48% with Moderate or High stormwater exposure
- PR-031Fox Hills5,512 properties · 31% with Moderate or High stormwater exposure
