Is Todt Hill flooding right now?
Checking live flood alerts and sewer overflow conditions…
Todt Hill Flood Exposure · NYC DEP Combined Sewer Area PR-029
Todt Hill, Staten Island - PR-029
Properties in this area share the PR-029 combined sewer — during moderate-to-heavy rain, runoff can exceed pipe capacity faster than it drains, which is what drives sewer backup exposure block by block. Here’s what that looks like for Todt Hill, Staten Island specifically.
PR-029 is a combined sewer area covering 9,821 properties in Todt Hill, Staten Island. Flood Form rates 41% of them Moderate or High for stormwater, 27% for sewer backup, 3% for groundwater, and 1% for coastal flooding. 94% of lots have yard area that legally qualifies for on-site infiltration. Ground elevation varies widely here: the land drops from about 248 ft to 29 ft, sloping down toward the northwest. Rain that falls uphill runs down the streets toward the low end, so properties there take on water from the blocks above as well as their own, and are the first to see ponding and sewer backups when the pipes fill. Properties higher up shed water downhill and pond less, so where a lot sits on the slope matters more here than any average for the area. The median building dates to 1970. 13% of parcels sit over a historic stream or pond. NYC DEP models about 51 combined sewer overflows a year at its outfall.
See where your property stands
Flood exposure in Todt Hill (PR-029)
The share of properties Flood Form rates Moderate or High for each type of flooding, on the same Minimal to High scale as an individual report.
41%
Stormwater exposure: Moderate or High
27%
Sewer Backup exposure: Moderate or High
3%
Groundwater exposure: Moderate or High
1%
Coastal exposure: Moderate or High
What sets Todt Hill (PR-029) apart
The three figures on which PR-029 differs most from the rest of NYC’s combined sewer areas.
219 ft
Elevation change from low to high ground
The steepest of NYC's combined sewer areas. Runoff from the higher blocks flows downhill onto the lower ones.
1970
Median year built
Newer than 98% of NYC's combined sewer areas. Recent construction tends to have up-to-date drains and sewer connections.
60%
Average impervious cover per lot
Lower than 98% of NYC's combined sewer areas. More open ground to absorb rain.
Stats computed from Flood Form’s NYC parcel data as of October 14, 2026
The worst corner in Todt Hill
Woolley Avenue & Garrison Avenue
Of the 99 four-way intersections Flood Form compared in PR-029, the 13 lots within 50 meters of this one carry the highest average compound flood exposure: a score of 17.6, against 5.9 across the sewershed.
High
Compound exposure
High
Stormwater exposure
Moderate
Sewer Backup exposure
Low
Groundwater exposure
Minimal
Coastal exposure
Ratings are for the average lot near the corner, on the same Minimal to High scale as a report
Common solutions for Todt Hill properties
The measures that most often suit conditions in PR-029. An individual Flood Form picks the exact set for one lot. See all flood prevention solutions.

Downspout Diversion
Redirect roof downspouts away from the sewer system toward permeable yard areas, planters, or a rain barrel.
Complexity: Low · 1–4 weeks

Modular Drywell System
An NDS Flo-Well modular drywell system lets water soak into the ground on-site.
Complexity: Moderate · 1–3 weeks

Rain Garden
A shallow planted depression that collects runoff from roofs and paved areas and lets it soak into the ground over a day or two.
Complexity: Low · 1–3 weeks

Area Drain
A yard area drain — a surface inlet at the lowest point in the yard — provides a direct outlet for stormwater that pools on the site.
Complexity: Low · 1–4 weeks

Backflow Preventer + Gate Valve
A backflow preventer on the building sewer lets wastewater flow out to the street but closes automatically when the municipal sewer surcharges, preventing sewage from backing up into the basement.
Complexity: Moderate · 2–6 weeks

Sewer Line Video Inspection
A licensed plumber runs a camera through the building sewer from a cleanout to the street connection, recording the condition of the pipe.
Complexity: Low · 1–2 weeks
Which of these fit your lot?
Your Flood Form rates your property’s exposure and recommends the measures suited to it.
City sewer and stormwater work in Todt Hill (PR-029)
The city has 5 sewer, stormwater and coastal projects planned, in design or under construction in this area. Another 3 projects are upgrading the treatment plant this area drains to.
5
City projects planned or underway
$189M
City budget for these projects
- New and upgraded sewers · Under construction
Storm Sewer Extension and Water Main Work in North Avenue, Staten Island
SchedulePast the city's forecast (Dec 2023)Spending$8.9M of $10.0MNYC Design and Construction
- Sewer repair · Under construction
Trench Restoration - Staten Island
ScheduleMay 2018 → May 2027Spending$4.4M of $11.4MNYC Design and Construction
- Sewer repair · Out to bid
Reconstruction of Existing Sewers, Staten Island
ScheduleMay 2025 → May 2027Spending$7.0M budgetNYC Design and Construction
- Coastal protection · In design
Citywide Seawall Reconstruction
ScheduleOct 2019 → Jul 2029Spending$215K of $13.4MNYC Parks
- New and upgraded sewers · Planned
New Storm Sewers in South Gannon Avenue and Nearby Streets
ScheduleDec 2025 → Jun 2030Spending$147M budgetNYC Design and Construction
Dates and dollars from the NYC Capital Projects Dashboard (May 2026 update) and the city's Capital Planning Database; street permits from NYC DOT, checked daily.
What does this mean for your property?
Projects like these work across a whole drainage area and take years to finish. They don't change how water reaches a building through its own sewer connection, doors or foundation, which is what a property-level plan addresses.
Questions about flooding in Todt Hill (PR-029)
What is the PR-029 sewershed in Todt Hill?
PR-029 is the part of Todt Hill, Staten Island whose combined sewer leads to NYC DEP outfall PR-029. Its 9,821 properties share that pipe for both rain and wastewater, so a heavy storm anywhere in the area uses up capacity for every block in it.
What causes sewer backups in Todt Hill (PR-029)?
Over the last 10 years, NYC DEP named a cause for 454 sewer backup reports in PR-029: 40% traced to a blockage or defect in the city sewer, 36% to the property's own plumbing, and 24% to heavy rain overloading the pipes. Blockages in the city sewer are NYC DEP's to clear, so each backup is worth reporting to 311.
Has street flooding been measured in Todt Hill (PR-029)?
Yes. Six FloodNet street-flood sensors in PR-029 have recorded 2 floods since they were installed, the deepest 4.8 inches. The most recent came on July 31, 2025. FloodNet is a citywide network of sensors that measure water on the street.
Can properties in Todt Hill (PR-029) manage stormwater on site?
94% of lots in PR-029 have yard area that legally qualifies for on-site infiltration, such as a drywell or rain garden. A lot without that room can still hold runoff with a detention tank or a blue roof.
Is Todt Hill flooding right now?
The live check at the top of this page shows whether flooding is likely in Todt Hill now. It combines National Weather Service flood alerts for Staten Island, NYC DEP's modeled combined sewer overflow advisories, and the past three hours of rain. Most NYC sewers are designed for about 1.75 inches of rain an hour, so a heavy downpour can flood streets and basements on low blocks before any alert goes out. Report street flooding or a sewer backup to 311, and call 911 if anyone is in danger.
Nearby neighborhoods and sewersheds
- PR-026Mariner's Harbor6,200 properties · 28% with Moderate or High stormwater exposure
- PR-028Graniteville598 properties · 25% with Moderate or High stormwater exposure
- PR-027Mariner's Harbor306 properties · 13% with Moderate or High stormwater exposure
- PR-037Port Richmond346 properties · 38% with Moderate or High stormwater exposure
- PR-031Fox Hills5,512 properties · 31% with Moderate or High stormwater exposure
- PR-006New Brighton231 properties · 48% with Moderate or High stormwater exposure