Skip to main content

Is Murray Hill flooding right now?

Checking live flood alerts and sewer overflow conditions…

Murray Hill Flood Exposure  ·  NYC DEP Combined Sewer Area TI-011

Murray Hill, Queens - TI-011

Properties in this area share the TI-011 combined sewer — during moderate-to-heavy rain, runoff can exceed pipe capacity faster than it drains, which is what drives sewer backup exposure block by block. Here’s what that looks like for Murray Hill, Queens specifically.

TI-011 is a combined sewer area covering 4,089 properties in Murray Hill, Queens. Flood Form rates 40% of them Moderate or High for stormwater, 18% for sewer backup, 9% for groundwater, and 4% for coastal flooding. 88% of lots have yard area that legally qualifies for on-site infiltration. Ground elevation varies widely here: the land drops from about 83 ft to 22 ft, sloping down toward the west. Rain that falls uphill runs down the streets toward the low end, so properties there take on water from the blocks above as well as their own, and are the first to see ponding and sewer backups when the pipes fill. Properties higher up shed water downhill and pond less, so where a lot sits on the slope matters more here than any average for the area. The median building dates to 1955. According to NYC DEP green infrastructure records, this sewershed drains to Flushing Creek. NYC DEP has built 172 green infrastructure assets here. NYC DEP models about 63 combined sewer overflows a year at its outfall.

See where your property stands

Sewershed TI-011
CSO Outfall
Stormwater Flooding
Historic Waterbody

Flood exposure in Murray Hill (TI-011)

The share of properties Flood Form rates Moderate or High for each type of flooding, on the same Minimal to High scale as an individual report.

40%

Stormwater exposure: Moderate or High

18%

Sewer Backup exposure: Moderate or High

9%

Groundwater exposure: Moderate or High

4%

Coastal exposure: Moderate or High

What sets Murray Hill (TI-011) apart

The three figures on which TI-011 differs most from the rest of NYC’s combined sewer areas.

1955

Median year built

Newer than 93% of NYC's combined sewer areas. Recent construction tends to have up-to-date drains and sewer connections.

63

Sewer overflows a year at the outfall, as modeled by NYC DEP

Higher than 94% of NYC's combined sewer areas. The shared pipe overflows to the waterway often.

172

NYC DEP green infrastructure assets built

Higher than 94% of NYC's combined sewer areas. City-built rain gardens and similar assets already take some runoff here.

Stats computed from Flood Form’s NYC parcel data as of October 14, 2026

The worst corner in Murray Hill

137th Street & 32nd Avenue

Of the 64 four-way intersections Flood Form compared in TI-011, the 10 lots within 50 meters of this one carry the highest average compound flood exposure: a score of 18.0, against 5.3 across the sewershed.

High

Compound exposure

High

Stormwater exposure

Low

Sewer Backup exposure

High

Groundwater exposure

High

Coastal exposure

Ratings are for the average lot near the corner, on the same Minimal to High scale as a report

Common solutions for Murray Hill properties

The measures that most often suit conditions in TI-011. An individual Flood Form picks the exact set for one lot. See all flood prevention solutions.

  • Downspout Diversion illustration

    Downspout Diversion

    Redirect roof downspouts away from the sewer system toward permeable yard areas, planters, or a rain barrel.

    Complexity: Low  ·  1–4 weeks

  • Modular Drywell System illustration

    Modular Drywell System

    An NDS Flo-Well modular drywell system lets water soak into the ground on-site.

    Complexity: Moderate  ·  1–3 weeks

  • Rain Garden illustration

    Rain Garden

    A shallow planted depression that collects runoff from roofs and paved areas and lets it soak into the ground over a day or two.

    Complexity: Low  ·  1–3 weeks

  • Area Drain illustration

    Area Drain

    A yard area drain — a surface inlet at the lowest point in the yard — provides a direct outlet for stormwater that pools on the site.

    Complexity: Low  ·  1–4 weeks

  • Backflow Preventer + Gate Valve illustration

    Backflow Preventer + Gate Valve

    A backflow preventer on the building sewer lets wastewater flow out to the street but closes automatically when the municipal sewer surcharges, preventing sewage from backing up into the basement.

    Complexity: Moderate  ·  2–6 weeks

  • Sewer Line Video Inspection illustration

    Sewer Line Video Inspection

    A licensed plumber runs a camera through the building sewer from a cleanout to the street connection, recording the condition of the pipe.

    Complexity: Low  ·  1–2 weeks

Which of these fit your lot?

Your Flood Form rates your property’s exposure and recommends the measures suited to it.

Questions about flooding in Murray Hill (TI-011)

What is the TI-011 sewershed in Murray Hill?

TI-011 is the part of Murray Hill, Queens whose combined sewer leads to NYC DEP outfall TI-011. Its 4,089 properties share that pipe for both rain and wastewater, so a heavy storm anywhere in the area uses up capacity for every block in it. When the pipe is over capacity, the overflow discharges to Flushing Creek.

What causes sewer backups in Murray Hill (TI-011)?

Over the last 10 years, NYC DEP named a cause for 195 sewer backup reports in TI-011: 63% traced to the property's own plumbing, 25% to a blockage or defect in the city sewer, and 12% to heavy rain overloading the pipes. When the cause is inside the property, a camera inspection of the house sewer line usually finds it.

How exposed to flooding is Murray Hill (TI-011)?

The most widespread exposure in TI-011 is stormwater: Flood Form rates 40% of properties Moderate or High for it. The share is 18% for sewer backup, 9% for groundwater and 4% for coastal flooding. These figures describe the whole area, and exposure varies lot by lot within it.

Can properties in Murray Hill (TI-011) manage stormwater on site?

88% of lots in TI-011 have yard area that legally qualifies for on-site infiltration, such as a drywell or rain garden. A lot without that room can still hold runoff with a detention tank or a blue roof.

Is Murray Hill flooding right now?

The live check at the top of this page shows whether flooding is likely in Murray Hill now. It combines National Weather Service flood alerts for Queens, NYC DEP's modeled combined sewer overflow advisories, and the past three hours of rain. Most NYC sewers are designed for about 1.75 inches of rain an hour, so a heavy downpour can flood streets and basements on low blocks before any alert goes out. Report street flooding or a sewer backup to 311, and call 911 if anyone is in danger.

Nearby neighborhoods and sewersheds

Queens Flood Map →All NYC sewersheds →