Skip to main content

Is Flatlands flooding right now?

Checking live flood alerts and sewer overflow conditions…

Flatlands Flood Exposure  ·  NYC DEP Combined Sewer Area CI-004

Flatlands, Brooklyn - CI-004

Properties in this area share the CI-004 combined sewer — during moderate-to-heavy rain, runoff can exceed pipe capacity faster than it drains, which is what drives sewer backup exposure block by block. Here’s what that looks like for Flatlands, Brooklyn specifically.

CI-004 is a combined sewer area covering 32,638 properties in Flatlands, Brooklyn. Flood Form rates 47% of them Moderate or High for stormwater, 23% for sewer backup, 5% for groundwater, and 1% for coastal flooding. 79% of lots have yard area that legally qualifies for on-site infiltration. The ground slopes gently down toward the southeast, from about 57 ft to 17 ft, so runoff from higher blocks drains toward lower ones. The median building dates to 1925. 3% of parcels sit over a historic stream or pond. According to NYC DEP green infrastructure records, this sewershed drains to Jamaica Bay and Tributaries. NYC DEP has built 8 green infrastructure assets here.

See where your property stands

Sewershed CI-004
CSO Outfall
Stormwater Flooding
Historic Waterbody

Flood exposure in Flatlands (CI-004)

The share of properties Flood Form rates Moderate or High for each type of flooding, on the same Minimal to High scale as an individual report.

47%

Stormwater exposure: Moderate or High

23%

Sewer Backup exposure: Moderate or High

5%

Groundwater exposure: Moderate or High

1%

Coastal exposure: Moderate or High

What sets Flatlands (CI-004) apart

The three figures on which CI-004 differs most from the rest of NYC’s combined sewer areas.

32,638

Properties in sewershed

Larger than 99% of NYC's combined sewer areas. Many lots share this one outfall.

8

NYC DEP green infrastructure assets built

Higher than 78% of NYC's combined sewer areas. City-built rain gardens and similar assets already take some runoff here.

23%

Properties with Moderate or High sewer backup exposure

Higher than 76% of NYC's combined sewer areas. Backups from the shared pipe are a concern on more lots here.

Stats computed from Flood Form’s NYC parcel data as of October 14, 2026

The worst corner in Flatlands

Rogers Avenue & Avenue D

Of the 437 four-way intersections Flood Form compared in CI-004, the 20 lots within 50 meters of this one carry the highest average compound flood exposure: a score of 21.1, against 6.1 across the sewershed.

High

Compound exposure

High

Stormwater exposure

High

Sewer Backup exposure

Low

Groundwater exposure

Minimal

Coastal exposure

Ratings are for the average lot near the corner, on the same Minimal to High scale as a report

Common solutions for Flatlands properties

The measures that most often suit conditions in CI-004. An individual Flood Form picks the exact set for one lot. See all flood prevention solutions.

  • Downspout Diversion illustration

    Downspout Diversion

    Redirect roof downspouts away from the sewer system toward permeable yard areas, planters, or a rain barrel.

    Complexity: Low  ·  1–4 weeks

  • Modular Drywell System illustration

    Modular Drywell System

    An NDS Flo-Well modular drywell system lets water soak into the ground on-site.

    Complexity: Moderate  ·  1–3 weeks

  • Rain Garden illustration

    Rain Garden

    A shallow planted depression that collects runoff from roofs and paved areas and lets it soak into the ground over a day or two.

    Complexity: Low  ·  1–3 weeks

  • Area Drain illustration

    Area Drain

    A yard area drain — a surface inlet at the lowest point in the yard — provides a direct outlet for stormwater that pools on the site.

    Complexity: Low  ·  1–4 weeks

  • Backflow Preventer + Gate Valve illustration

    Backflow Preventer + Gate Valve

    A backflow preventer on the building sewer lets wastewater flow out to the street but closes automatically when the municipal sewer surcharges, preventing sewage from backing up into the basement.

    Complexity: Moderate  ·  2–6 weeks

  • Sewer Line Video Inspection illustration

    Sewer Line Video Inspection

    A licensed plumber runs a camera through the building sewer from a cleanout to the street connection, recording the condition of the pipe.

    Complexity: Low  ·  1–2 weeks

Which of these fit your lot?

Your Flood Form rates your property’s exposure and recommends the measures suited to it.

City sewer and stormwater work in Flatlands (CI-004)

The city has 6 sewer, stormwater and coastal projects planned, in design or under construction in this area. City sewer contractors hold 5 active street permits here today. Another 5 projects are upgrading the treatment plant this area drains to.

6

City projects planned or underway

5

Active street permits for city sewer work

$373M

City budget for these projects

  • Green infrastructure · Under construction

    Street Green Infrastructure in CI-005, Brooklyn

    SchedulePast the city's forecast (Jun 2024)
    Spending$19.7M of $24.6M

    NYC Design and Construction

  • Green infrastructure · Out to bid

    Gravesend Bay Green Infrastructure, Phase I

    ScheduleAug 2017 → Jan 2030
    Spending$11.4M of $104M

    NYC Design and Construction

  • Sewage pumping · Out to bid

    Reconstruction of Paerdegat Pumping Station, Brooklyn, NY

    ScheduleSep 2022 → Mar 2030
    Spending$541K of $90.5M

    NYC Environmental Protection

  • Sewer repair · Out to bid

    Trench Restoration Brooklyn

    ScheduleJun 2018 → Sep 2029
    Spending$4.8M of $67.9M

    NYC Design and Construction

  • New and upgraded sewers · Planned

    Replacement and Rehabilitation of deep sewer manholes

    ScheduleDec 2024 → Jun 2030
    Spending$1.0M of $48.3M

    NYC Design and Construction

  • New and upgraded sewers · Stage not reported

    Upgrade sewers on Avenue L between Ocean & Bedford avenue BKLYN

    ScheduleJun 2026 → Jun 2033
    Spending$37.4M budget

    NYC Environmental Protection

Dates and dollars from the NYC Capital Projects Dashboard (May 2026 update) and the city's Capital Planning Database; street permits from NYC DOT, checked daily.

What does this mean for your property?

Projects like these work across a whole drainage area and take years to finish. They don't change how water reaches a building through its own sewer connection, doors or foundation, which is what a property-level plan addresses.

Questions about flooding in Flatlands (CI-004)

What is the CI-004 sewershed in Flatlands?

CI-004 is the part of Flatlands, Brooklyn whose combined sewer leads to NYC DEP outfall CI-004. Its 32,638 properties share that pipe for both rain and wastewater, so a heavy storm anywhere in the area uses up capacity for every block in it. When the pipe is over capacity, the overflow discharges to Jamaica Bay and Tributaries.

Which Flatlands sewershed has the most sewer backups?

Flatlands is split across two sewersheds. CI-004 has the most sewer backup reports of the two: 83 in every 1,000 lots over the last 10 years. CI-006 has 74. This page covers CI-004, and its map outlines the blocks it includes.

Do properties in Flatlands (CI-004) report sewer backups?

Over the last 10 years, 83 in every 1,000 lots in CI-004 filed a 311 sewer backup report, against a median of 75 across NYC's combined sewer areas. NYC DEP confirmed a problem in the city sewer, from rain overload to a blockage, at 17 in every 1,000 lots. The most reports came in 2021, the year of Ida: 858.

Has street flooding been measured in Flatlands (CI-004)?

Yes. Nine FloodNet street-flood sensors in CI-004 have recorded 27 floods since they were installed, the deepest 8.8 inches. The most recent came on August 20, 2026. FloodNet is a citywide network of sensors that measure water on the street.

Is Flatlands flooding right now?

The live check at the top of this page shows whether flooding is likely in Flatlands now. It combines National Weather Service flood alerts for Brooklyn, NYC DEP's modeled combined sewer overflow advisories, and the past three hours of rain. Most NYC sewers are designed for about 1.75 inches of rain an hour, so a heavy downpour can flood streets and basements on low blocks before any alert goes out. Report street flooding or a sewer backup to 311, and call 911 if anyone is in danger.

From The Waterline

Field notes from Flatlands

All posts on The Waterline → · Get new field notes by email →

Nearby neighborhoods and sewersheds

Brooklyn Flood Map →All NYC sewersheds →